Similar Projects
Last Updated | 05/09/2023 11:02 AM |
Project Title | 2023 Summer Painting Project, Package 3 |
Physical Address | View project details and contacts |
City, State (County) | Concord, CA 94520 (Contra Costa County) |
Category(s) | Single Trades |
Sub-Category(s) | Finishes/Exterior |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $240,000 [brand] Estimate |
Plans Available from | Agency's Affiliate - 03/28/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Exterior paint of entire campus, including power wash, prime, and paint of Walnut Acres, Woodside, and Silverwood Elementary Schools. The District s Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. A cashier's check or a certified check, drawn to the order of the Mt. Diablo Unified School District, in the amount of ten percent (10%) of the total bid price.The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Project. Question Deadline 04/20/2023 at 3:00 PM PT Request for Information Deadline Summary This document describes existing conditions at or near the Project and use of information available regarding existing conditions. This document is not part of the Contract Documents. See General Conditions for definition(s) of terms used herein. Contractor is required to request from the District a copy of any reports that it believes are necessary to perform Contractor's Work in a safe, efficient and workman-like manner. 2. Reports and Information on Existing Conditions a. Documents providing a general description of the Site and conditions of the Work may have been collected by District, its consultants, contractors, and tenants. These documents may include previous contracts, contract specifications, tenant improvement contracts, as-built drawings, utility drawings, and information regarding underground facilities. b. Information regarding existing conditions may be inspected at the District offices or the Construction Manager's offices, if any, and copies may be obtained at cost of reproduction and handling upon Bidder's agreement to pay for such copies. These reports, documents, and other information are not part of the Contract Documents. c. Information regarding existing conditions may also be included in the Project Manual, but shall not be considered part of the Contract Documents. d. The reports and other data or information regarding existing conditions and underground facilities at or contiguous to the Project will be presented as needed, as attachments and/or Addenda |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |