Similar Projects
Water AMI Meter Replacement Project
Infrastructure
Sub-Bidding
$611,000 CJ est. value
Homestead, FL 33030

Affordable Housing - Standby Generator Installation
Renovation
Sub-Bidding
$60,000 CJ est. value
Hialeah, FL 33010

Pre-Qualification Pool Purchase of Light Poles, Fixtures, and Bases
Alteration
Post-Bid
Miami Beach, FL

Systemwide Emergency Power Generators Maintenance
Alteration
Post-Bid
Miami, FL

Mary Collins Community Center Cabinet Replacement
Renovation
Results
$35,868 CJ est. value
Miami Lakes, FL 33016

Traffic Ops Push-Button Roadway Miscellaneous Construction - Miami-Dade
Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Miami, FL 33132

Shore Power For Terminals
Term Contract
Post-Bid
$97,439,913 est. value
Miami, FL 33132

Installation and Removal of Holiday Lighting
Term Contract
Post-Bid
$42,000 CJ est. value
North Miami, FL 33161

Purchase of Wire for the FKAA J.R. DEAN Water Treatment Plant Wire Replacement Project
Term Contract
Post-Bid
Homestead, FL 33034

Electrical Repair Services at Police Facilities
Term Contract
Post-Bid
Miami, FL 33132

Citywide Miscellaneous Electrical Services
Term Contract
Post-Bid
Miami Springs, FL 33166

Sports Field Lighting Strengthening Project
Infrastructure
Post-Bid
$400,000 CJ est. value
Miami Lakes, FL 33014

Fire Alarm Replacement at Pennsylvania Garage
Renovation
Post-Bid
$60,000 CJ est. value
Miami Beach, FL 33139

SR 836/SR 826 Interchange Aesthetic Lighting
Infrastructure
Post-Bid
$200,000 CJ est. value
Miami, FL 33132

Electrical Contractor To Provide Electrical Installation,repairs Services, Maintenance And Other Related Work
Renovation
Post-Bid
$100,000 CJ est. value
Miami, FL 33132

Last Updated 01/03/2024 03:02 PM
Project Title

Alexander Orr Jr. Water Treatment Plant Wells 1 to 10 Upgrade Transformers and Replacements

Physical Address View project details and contacts
City, State (County) Miami, FL 33173   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $3,500,583 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of furnishing all materials, labor, and equipment necessary for electrical improvements that consist of replacing the existing 112.5KVA & 225KVA Transformers, proposed medium voltage cast-in-place concrete manholes (4000 psi)(10'x10'x7'), installation of concrete ductbank for wellhouses #1 through #10 feeders, and wires; which is owned and operated by the Miami-Dade Water and Sewer Department (OWNER), and located at 6800 SW 87th Avenue, Miami, FL 33173.Existing System Description:Wellhouse Facilities (1 thru 10) Currently Alexander Orr Water Treatment Plant have Ten (10) Wellhouses to pump Water. Wellhouses #1, #8, #9, #10 currently have 225KVA Transformers and Wellhouses #2, #3, #4, #5, #6, #7 currently have 112.5KVA Transformers with Obsolete Primary Switches. Wellhouses#1 thru #7 are currently fed from Transformers T6 and T10 Load Break Switch thru existing Ductbank. Wellhouses #8 thru #10 are currently fed from Transformer T14. A Kirk Key Interlock switch (At Wellhouse#7) serves as a safety interlock to ensure Wellhouse Transformers will not energized with both feeders at the same time.Installing of Owner Furnished Equipment (OFE) Primary Switches For all 10 Wellhouses. SBE-Con. Requirements:9.98% ,SBE-G Requirements : 1.60% Performance & Payment Bond Required: yes Bid Bond Required: yes. In the event a firm is established by executives, supervisors and other senior field staff (key employees) that would have met these minimum experience requirements with a prior firm, owner reserves the right to qualify the firm based on owner sole determination and evaluation of the knowledge and prior experience of these key employees employed by the new firm. The experience of key senior personnel with other firms may be counted towards the experience requirement, if acceptable to the engineer. Should such evidence not be satisfactory to the engineer, whose decision shall be final, the bid will be considered non-responsive, and the second lowest bidder will be considered for award. The qualifying proof shall be submitted in a separate sealed e nvelope with the bid.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents