Similar Projects
Annular Steel Culvert
Term Contract
Bidding
Boulder, CO

2021 Road and Drainage Project
Bidding
Gunnison, CO

SH 103 Culvert Replacement
Post-Bid
Idaho Springs, CO 80452

High Point Neighborhood Park West
Post-Bid
Denver, CO

Embankment Material
Results
CO

Culvert Relining (Spray-Applied)
Results
Less than $1,000,000 est. value
CO

Middle Cow Creek Culvert
Bidding
Steamboat Springs, CO

Detention Ponds Improvement Project
Post-Bid
Golden, CO

Suckla #1 Reclamation
Results
Less than $25,000 est. value
Naturita, CO 81422

Homestake Surge Pond Rehabilitation Project
Bidding
CO

District Infrastructure To Service Solstice Filings 2-4
Post-Bid
Centennial, CO

Pipe Supply for City Streets Division
Results
Grand Junction, CO 81501

Design Services for Cherry Creek Reservoir Shoreline Stabilization ESS and Tl PRFS
Bidding
CO

Constructing Two Extended Detention Basins, Trenching, and Drainage Pipe
Post-Bid
$5,000,000 to $20,000,000 est. value
CO

Pmaa, Wray SFU - Pond Liners
Results
Less than $361,669 est. value
Wray, CO 80758

Last Updated 12/11/2020 04:16 PM
Project Title

Highland Hills Golf Course Pond Project

Physical Address View project details and contacts
City, State (County) Greeley, CO   (Weld County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish labor, materials, supplies, equipment, tools, and transportation, and perform operations in connection with, and reasonably incidental to, complete installation of pond lining and guarantee/warranty as shown on drawings, installation details, and as specified herein. Items of work specifically included are: A. Procurement of applicable licenses permits, and fees. B. Furnishing materials and qualified labor for installation of liner and geotextile for pond area as shown on drawings. Contractor is responsible for supplying appropriate quantity of liner materials based on construction drawings and field conditions. C. Removal of debris in bottom of pond and 4- to 6-inches of existing side slope (large debris and weeds). D. Furnishing materials and labor for construction of anchor trench around entire perimeter of pond. E. Furnishing materials and qualified labor for liner boots at pipe penetrations through liner material prior to installing soil cover over liner. F. Completion of earthwork by a qualified earthwork contractor meeting the requirements specified herein. G. Coordination of pond grading with drawings and specifications or other disciplines where applicable. H. Coordinate and provide services of lining manufacturer’s Technical Field Representative for a minimum of one (1) site visit during construction, including expenses, to verify and document Quality Assurance and testing procedures.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents