Similar Projects
PRESS - Blake Pond - Dan Ryan Builders
New Construction, Infrastructure - 30,000 SF
Design
Lillington, NC 27546

PRESS - Blake Pond - Dan Ryan Builders
New Construction, Infrastructure - 30,000 SF
Design
Lillington, NC 27546

Housing Reconstruction Contract
Renovation
Post-Bid
Dunn, NC 28334

Multiple Schools - Additions / Renovations
Addition, Demolition, Renovation, Infrastructure - 51,869 SF
Post-Bid
$15,000,000 CJ est. value
Lillington, NC 27546

City Of Dunn Cdbg-Nr Reconstruction Project: Contract Stella Mcdonald
Renovation
Results
Dunn, NC 28334

Harnett Regional Jetport New Terminal Building
New Construction, Infrastructure - 7,035 SF
Results
$4,962,449 CJ est. value
Erwin, NC 28339

Hwy 55 Burgers Shakes & Fries
New Construction - 2,949 SF
Construction
$500,000 to $1,000,000 CJ est. value
Dunn, NC 28334

Sanford Industrial Park
New Construction, Infrastructure
Pending Verification
$116,200,000 CJ est. value
Sanford, NC 27330

East Coast Logistics Park
New Construction, Infrastructure - 1,500,000 SF
Pending Verification
$805,000,000 CJ est. value
Dunn, NC 28334

Sherri Downs Residential Development / Angier
New Construction, Infrastructure
Design
$86,800,000 CJ est. value
Angier, NC 27501

RFQ D/B - Neills Creek Park Concession and Restroom Facility
New Construction, Infrastructure
Post-Bid
$900,000 CJ est. value
Angier, NC 27501

Honeycutt Hills
New Construction, Infrastructure
Pending Verification
$18,800,000 CJ est. value
Angier, NC 27501

Love's Travel Stop #412 / Dunn
New Construction, Infrastructure - 11,287 SF
Post-Bid
$3,500,000 CJ est. value
Dunn, NC 28334

Gardner Farms
New Construction, Infrastructure
Pending Verification
$53,217,000 CJ est. value
Angier, NC 27501

Petco #5522 / Dunn
New Construction, Infrastructure - 11,875 SF
Post-Bid
$2,500,000 CJ est. value
Dunn, NC 28334

Last Updated 01/13/2023 11:10 AM
Project Title

Station Point

Physical Address View project details and contacts
City, State (County) Angier, NC 27501   (Harnett County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Single-Family Homes, Site Development
Contracting Method To Subcontract, Bids by Invitation
Project Status Design Development, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $95,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a new community with a mix of single-family homes and townhomes on 91.85 acres. As of January 13, 2023, the preliminary plans have been approved with conditions by the City of Angier and are currently under secondary review. A homebuilder has been selected. Interested subcontractors may reach out to the Purchasing Department at Dan Ryan Builders for vendor opportunities. Although a firm timeline for construction has not been determined, the community is scheduled to open in 2024.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents