Similar Projects
O'Reilly Auto Parts (ALD)
New Construction - 6,800 SF
Conception
$500,000 to $900,000 est. value
Ashland, MO

Walmart Supercenter #451-247 - CSP
Renovation - 189,034 SF
Design
Columbia, MO 65201

O'Reilly Auto Parts (CO5)
New Construction - 6,800 SF
Design
$500,000 to $900,000 est. value
Columbia, MO

4230 Philips Farm Road - Discovery Park Dermatology Build Out
New Construction, Infrastructure - 31,986 SF
Bidding
$3,600,000 CJ est. value
Columbia, MO 65201

Pierpont Meadows Entrance Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Three Creeks Township, MO 65201

Parking Garage Glass Cleaning Services
Term Contract
Sub-Bidding
Columbia, MO 65201

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Earth Moving Services - Multi Year
Term Contract, Infrastructure
Post-Bid
Columbia, MO

Sitework Services
Term Contract
Results
Columbia, MO

Critical Care C3016
Renovation, Addition
Results
$1,265,038 to $1,405,598 est. value
Columbia, MO

Natural Grocers
Renovation - 15,000 SF
Construction
Columbia, MO 65203

Memorial Student Union Restroom Renovation S111 & S113
Renovation
Construction
$160,500 est. value
Columbia, MO

RFQ Design - Professional Architectural and Engineering Design Consulting Services
New Construction, Infrastructure
Pending Verification
$67,000,000 CJ est. value
Columbia, MO 65203

Crowder Hall Renovation - University Of Missouri
Renovation - 25,181 SF
Pending Verification
$7,711,000 CJ est. value
Columbia, MO 65203

Horticulture Farm Agroforestry Education & Research Center New Building Shell
New Construction - 4,920 SF
Design
$535,000 est. value
Columbia, MO

Last Updated 08/17/2022 04:10 PM
Project Title

Virginia Avenue Parking Structure - Relocate C-Store From Pershing Hall

Physical Address View project details and contacts
City, State (County) Columbia, MO 65201   (Boone County)
Category(s) Commercial, Education, Heavy and Highway
Sub-Category(s) College/University, Parking Garage, Retail, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $613,885 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Virginia Avenue Parking Structure - Relocate C-Store From Pershing Hall Questions regarding the scope of work should be directed to Majid Amirahmadi with International Architects Atelier at (816) 471-6522 or majid@i-a-a.com. Questions regarding commercial conditions should be directed to Jody Miller at (573) 884-8912 or jrmiller@missouri.edu. Information regarding bid results will be available the day following the bid opening by calling (573) 882-1133 A Diversity Participation goal of 10% MBE, 10% Combined WBE, DBE, Veteran Owned Business and 3% SDVE has been established for this contract. The Owner reserves the right to waive informalities in bids and to reject any and all bids. CONSTRUCTION ESTIMATE: $552,496 - $613,885 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. liquidated damages and not as a penalty, the sum of One Hundred Dollars ($100.00) per day

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Site Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents