Similar Projects
Idaho to Smoot Border Junction North US 26/89 - Wyoming Department of Transportation
Infrastructure
Conception
$2,534,000 CJ est. value
Cokeville, WY 83114

Idaho to Smoot Border Junction North US 26/89 - Wyoming Department of Transportation
Infrastructure
Conception
$2,534,000 CJ est. value
Cokeville, WY 83114

Replace/Repair 10 Fire Hydrants
Infrastructure
Bidding
$30,000 CJ est. value
Cokeville, WY 83114

Replace/Repair 10 Fire Hydrants
Infrastructure
Bidding
$30,000 CJ est. value
Cokeville, WY 83114

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Diamondville Cemetery Storage Building Access Driveway
Infrastructure
Post-Bid
$2,000,000 est. value
Kemmerer, WY

North Wilson Area Snow Removal Project (7-21-M)
Term Contract, Infrastructure
Results

District 3 Stockpiles
Infrastructure
Results

Cokeville to Sage Junction Sage East / US 30 - N121119 - Wyoming Department of Transportation
Infrastructure
Conception
$5,038,000 CJ est. value
Cokeville, WY 83114

Slate Creek Water Well Redrill
Infrastructure
Bidding
$100,000 CJ est. value
Opal, WY 83124

Concrete and Handrail Replacement
Infrastructure
Post-Bid
$200,000 CJ est. value
Kemmerer, WY 83101

District 3 Crack Seal
Infrastructure
Results

Kemmerer To Granger Opal East / US 30 - N121120 - Wyoming Department of Transportation
Infrastructure
Conception
$10,855,000 CJ est. value
Kemmerer, WY 83101

New and Renovated Roads 2022
Infrastructure
Post-Bid
$520,000 est. value
Cokeville, WY

Milling Plant Mix, Bituminous Pavement Surfacing and Miscellaneous Work
Infrastructure
Results

Last Updated 08/25/2022 07:04 PM
Project Title

Dry Fork Smiths Fork Road Realignment and Stream Restoration Project

Physical Address View project details and contacts
City, State (County) Smoot, WY 83126   (Lincoln County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Owner's Representative
Owner View project details and contacts
Architect View project details and contacts
Description

Notice is hereby given that Trout Unlimited is announcing that solicitation for qualifications and bid information is available for the furnishing of the: Dry Fork Smiths Fork Road Realignment and Stream Restoration Project The project site is in Wyoming about 26 miles north from Cokeville, Wyoming. This bid proposal will be for construction along the Dry Fork Smiths Fork on the High Desert District of the Bureau of Land Management. Activities will include construction of about 500 linear feet of new gravel-surfaced road and the reclamation of a similar length road segment, installation of a stream crossing culvert, and about 520 feet of stream habitat restoration. Construction work is planned to occur between July 15 and October 1, 2023. This is not a Request for Proposal. Trout Unlimited is not obligated by this announcement to award any contract. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents