Similar Projects
Exterior Door Replacement - Shenandoah Park Storage
Alteration
Bidding
$25,000 est. value
Davie, FL 33325

Exterior Door - Fleet Maintenance Garage
Alteration
Bidding
Davie, FL 33314

Repair of Electric Gates
Post-Bid
Sunrise, FL 33351

Impact Windows
Post-Bid
Parkland, FL 33067

Cultural Arts Banquet Hall Door Replacement
Results
Miramar, FL 33025

Fire Stations 34 and 44 Wind Retrofit-HMGP
Results
Less than $987,010 est. value
North Lauderdale, FL 33068

Impact Windows
Post-Bid
Hollywood, FL 33024

Replacement of Windows and Doors for the Hazard Mitigation Grant
Results
Less than $386,000 est. value
Pembroke Pines, FL 33027

Impact Windows and Doors
Renovation
Post-Bid
Plantation, FL 33322

Wind Retrofit City Hall and Champions Hall - HMGP
Results
Less than $644,409 est. value
North Lauderdale, FL 33068

Impact Windows
Renovation
Post-Bid
Hollywood, FL

Drive-Through Window Installation
Results
Fort Lauderdale, FL 33301

Impact Windows
Renovation
Post-Bid
Fort Lauderdale, FL 33317

Fire Station 39 Bay Door Replacement
Results
Sunrise, FL 33313

Impact Windows and Doors
Alteration
Post-Bid
Hollywood, FL 33024

Last Updated 06/30/2021 10:58 AM
Project Title

Exterior Door Replacement

Physical Address View project details and contacts
City, State (County) Davie, FL 33328   (Broward County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall furnish all labor, equipment, tools, materials, and incidentals necessary to remove existing storefront door unit, jambs, door handles, door locks, frames, automatic door closers, thresholds, and all the accessories and hardware needed to replace them with new aluminum glass impact resistant doors, jambs, door handles, frames, automatic door closers, thresholds, and accessories and/or hardware of the same size and configuration as the existing. The existing key lock will be used in new door. All components/hardware shall match existing. Any stucco, paint, and/or flooring damaged by the removal and installation of the doors shall be repaired by the contractor.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents