Similar Projects
New Gray Rock Road Water Main Extension
Infrastructure
Design
$2,000,000 CJ est. value
Tega Cay, SC 29708

Wheelchair Ramp With Landing
Infrastructure
Post-Bid
$50,000 CJ est. value
Anderson, SC 29624

Foundation Repairs at Webb WMA
Alteration
Post-Bid
Garnett, SC 29922

Concrete Pads
Alteration
Results
Less than $100,000 est. value
SC

Concrete Asphalt Repair to a Fueling Station
Infrastructure, Alteration
Results
Sumter, SC

Luminaire Installation/Repairs
Infrastructure
Construction
$24,718 CJ est. value
Edgefield, SC 29824

Public Works Concrete Work Phase II
Alteration
Post-Bid
Clemson, SC

Concrete
Alteration
Results
Roebuck, SC

District 4 Reclamation
Alteration
Post-Bid
Chester, Lancaster, York, SC 29745

Mt. Zion Elementary School Portable Buildings
Renovation, Infrastructure
Results
$809,247 CJ est. value
Johns Island, SC 29455

Concrete
Alteration
Post-Bid
Columbia, SC

Former Finance Building Structural and Plumbing Repairs for Office Use - Rebid
Renovation
Results
$340,620 CJ est. value
Columbia, SC 29212

RFP Paving Contractors - Hope Center for Children Parking Lots & Driveways
Infrastructure
Post-Bid
$200,000 CJ est. value
Spartanburg, SC 29306

Celebration Boulevard Sidewalk Improvements
Infrastructure
Results
$247,825 CJ est. value
Florence, SC 29501

Saluda Maintenance Concrete and Flowable
Infrastructure, Alteration
Post-Bid
Prosperity, SC 29127

Last Updated 05/25/2023 02:02 AM
Project Title

Garrett Academy - ARC Building Roof and HVAC Replacement

Physical Address View project details and contacts
City, State (County) North Charleston, SC 29405   (Charleston County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $3,984,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This Scope of Work includes, but is not limited to: Replacement of roofing and HVAC at the Arc Building of Garrett Academy as outlined in the project. The Owner has retained the services of a Program Manager to represent the Owner's interest during construction. For information regarding this project please contact the Program Manager: Peter Hedegor Cumming Construction Management, Inc. 3820 Faber Place Drive, Suite 600, N. Charleston, SC 29405 Phone:(843) 860-2347 Email:phedegor@cumming-group.com All bids are to be accompanied by a bid bond or certified check of not less than five percent (5%) of the base bid. Bid securities of the three low bidders will be retained until Contract award and execution. Bids will be binding for a period of sixty (60) calendar days from the date bids are opened. The successful bidder will be required to furnish Performance Bond and Labor and Materials Bond in the amount of one hundred percent (100%) of the Contract Amount. Bids are to be submitted on the bid form provided, enclosed in a sealed opaque envelope bearing the name and address of the bidder, contractor's license number, identification of contract being bid and name of project. All bids must comply with the laws of the State of South Carolina UESTIONS MUST BE RECEIVED BY: May 10, 2023 @ 2:00pm

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents