Similar Projects
Postvale Road, Grier Road Rehabilitation Phase 2 - ST095 - Town of Marana
Infrastructure
Conception
$260,000 est. value
Marana, AZ

Tangerine Road Widening, Phase 2A - ST098 - Town of Marana
Alteration
Conception
$27,000,000 est. value
Marana, AZ 85658

AutoZone #3618 / Tucson (Ajo)
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Tucson, AZ 85757

AutoZone #3618 / Tucson (Ajo)
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Tucson, AZ 85757

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Mission Manor Parking Lot Repair and Addition
Infrastructure
Post-Bid
Tucson, AZ 85706

High Water Crossing at Vamori Wash
Results
$10,000,000 to $20,000,000 est. value
Tucson, AZ 85746

Pavement Preservation 2022
Infrastructure
Results
Marana, AZ 85653

Lohse Family YMCA Phase 2 - TI Package
Infrastructure, Renovation
Construction
$2,500,000 CJ est. value
Tucson, AZ 85701

Lohse Family YMCA Phase 2 - TI Package
Infrastructure, Renovation
Construction
$2,500,000 CJ est. value
Tucson, AZ 85701

22nd Street Manufacturing and Warehouse Building
New Construction, Infrastructure - 16,100 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85713

South Kolb Road Self-Storage
New Construction, Infrastructure - 14,511 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85756

First Avenue - River To Grant - SR11 - City Of Tucson
Infrastructure
Conception
$71,988,200 CJ est. value
Tucson, AZ 85719

Valencia - Kolb To Houghton - SR14 - City Of Tucson
Infrastructure
Design
$22,388,700 CJ est. value
Tucson, AZ 85746

Last Updated 03/17/2023 03:06 PM
Project Title

Tangerine Road Corridor Project- Phase 2B (Dove Mountain Boulevard/Twin Peaks Road to Tangerine Business Loop)

Physical Address View project details and contacts
City, State (County) Marana, AZ 85658   (Pima County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Schematic Drawings, Request for Qualifications, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

To address and accommodate planned development in the area, Phase 2 of the Tangerine Road Corridor improvements will be constructed in two-phases. The western two-and-a-half miles (Phase 2A), from I-10 through Tangerine Business Loop is slated to be constructed first, with a start date estimated for mid-2023. Design of Phase 2B, Dove Mountain Boulevard/Twin Peaks Road to Tangerine Business Loop, will continue during construction of Phase 2A. SEE: Tangerine Road Corridor Project- Phase 2A (from I-10 through Tangerine Business Loop) As of August 23, 2022, an engineer has been selected for the project. A firm timeline for construction has not been disclosed. *The closed solicitation has been included below for reference: The Town of Marana's Department of Public Works (TOWN) seeks Professional Consulting Engineering Services associated with the design for the Regional Transportation Authority (RTA)-funded widening of phase 2 of Tangerine Road between Interstate 10 and Dove Mountain Boulevard/Twin Peaks Road. Through this opportunity, the TOWN seeks to establish an innovative, solutions-oriented design toward the improvements and widening of this major roadway corridor from a two-lane rural roadway to a desert parkway arterial roadway. The OFFEROR's Team for this project should be multi-disciplinary and shall include expertise in all appropriate areas of arterial roadway design. OFFERORs submitting qualifications for this project should include specific project examples to clearly demonstrate their experience with this type of work.. . Final date for inquiries has been extended to September 29, 2021 @ 3:00 p.m. The method of Contractor Selection has not been Determined at this time.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents