Similar Projects
Fire Station Number 6 - FM-22-1811 - City of Lawrence
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
Lawrence, KS 66044

Pump Station 16 Upstream Interceptor Rehab - MS-21-0022 - City of Lawrence
Infrastructure
Conception
$1,170,000 CJ est. value
Lawrence, KS 66044

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

City of Lawrence Field Operations Campus
New Construction, Infrastructure
Design
$29,000,000 CJ est. value
Lawrence, KS 66044

Grading, Bridge and Surfacing
Infrastructure
Bidding
$2,000,000 CJ est. value
Cummings, KS 66016

Grading, Bridge and Surfacing
Infrastructure
Bidding
$2,000,000 CJ est. value
Cummings, KS 66016

Great Bend Police Station and Court Facility
New Construction, Infrastructure
Post-Bid
$8,000,000 CJ est. value
Great Bend, KS 67530

Quincy Street Improvements
Infrastructure
Post-Bid
Pittsburg, KS 66762

K-27 - Grading, Bridge and Surfacing
Infrastructure
Results
KS

US-36 - Surface Recycle
Infrastructure
Results
KS

Berry Global Addition
Addition, Demolition, Infrastructure
Construction
$1,500,000 CJ est. value
Lawrence, KS 66049

902 Storage / Lawrence
New Construction, Infrastructure
Pending Verification
$800,000 CJ est. value
Lawrence, KS 66049

902 Storage / Lawrence
New Construction, Infrastructure
Pending Verification
$800,000 CJ est. value
Lawrence, KS 66049

New Hampshire Parking garage stairway enclosures - MS-23-0058 - City of Lawrence
New Construction, Infrastructure
Conception
$1,700,000 CJ est. value
Lawrence, KS 66044

Eagle Bend and YSC Irrigation Water Supply Project - MS-20-0012 - City of Lawrence
Infrastructure
Design
$1,100,000 CJ est. value
Lawrence, KS 66044

Last Updated 04/14/2023 06:04 PM
Project Title

Coffey County Offsite Parking Improvements

Physical Address View project details and contacts
City, State (County) Burlington, KS 66839   (Coffey County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $360,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes sidewalk demolition, paving demolition, curb demolition, storm demolition, CMP removals, traffic signage modifications, irrigation modifications, site grading, new sidewalks, new curbs, new asphalt paving, new gravel paving, striping, and new storm work for the offsite parking improvements. Work Categories: * 32 Site Improvement Package: Bids are to be inclusive of all work as detailed and designed in the Toth & Associates drawings dated 10 March 2023, and River City Construction, LLC's Scope of Work described in section 00 0290 of the Bid Documents. This is a construction management at risk project. All contractors on this Project are considered Subcontractors to River City Construction, L.L.C (RCC). Construction shall be in full accordance with the Construction Documents created by Toth & Associates. Procurement and Contracting Requirements: 3/31/23, 12:56 PM JustPaste.it - paste text and share with your friends website. Project is Tax Exempt * All Bids are to be hand delivered in a sealed envelope Request for Information/Clarifications. Scope review meetings will be set up with apparent low bidders to review in further detail. Such bond shall be provided within ten (10) days of the award of the Contract by the successful bidders. Bid Bond is required at time of bid. All RFIs/Clarifications are due to River City Construction no later than 4/5/23 @ 5pm CST. All RFIs should be sent to Justin Beaty, jbeaty@rccllc.com. Summary of Work The project includes sidewalk demolition, paving demolition, curb demolition, storm demolition, CMP removals, traffic signage modifications, irrigation modifications, site grading, new sidewalks, new curbs, new asphalt paving, new gravel paving, striping, and new storm work for the offsite parking improvements

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents