Similar Projects
Millikin University Student-Athlete Facility
New Construction, Infrastructure, Renovation - 10,870 SF
Design
$6,700,000 CJ est. value
Decatur, IL 62522

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Water Main Improvements
Infrastructure
Post-Bid

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Clarifier Conversion
Renovation
Results
$15,600,000 est. value
Decatur, IL 62521

Southeast Learning Center Demolition
Demolition
Results
Decatur, IL 62521

A-O Grade School Pavement Rehabilitation
Infrastructure
Construction
$333,852 CJ est. value
Oreana, IL 62554

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

2022 Valve and Hydrant Replacement
Infrastructure
Results
$480,988 est. value
Decatur, IL

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Post-Bid
Schaumburg, IL 60194

Water System Improvements Division 2: Raw Watermain Replacement
Infrastructure
Results
Macon, IL

Water System Improvements Phase 2 - Watermain Replacement
Infrastructure
Post-Bid
$1,212,875 CJ est. value
Blue Mound, IL 62513

Water System Improvements Division 3: Raw Watermain & Cole Street Watermain Replacement
Infrastructure
Results
Macon, IL 62544

Demolition/Construction of a Concrete Pad at Sinawik Park
Infrastructure
Post-Bid
$1,496,000 CJ est. value
Decatur, IL 62521

Water System Improvements Division 4: Water Metering System Replacement
Infrastructure
Results
Macon, IL

Last Updated 12/08/2022 10:31 PM
Project Title

Well 7 Construction and Raw Water Main Extension

Physical Address View project details and contacts
City, State (County) Maroa, IL 61756   (Macon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,707,820 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Contract Documents, including plans and specifications, may be examined at the following locations: 1. Chastain & Associates, LLC, 5 N. Country Club Road, Decatur, IL 62521 The work includes: The construction of a new water Well No. 7 along Brush College Rd. one-half mile north of School Rd. and construction of 2,246 feet of 16-inch raw watermain from proposed Well No. 7 to existing Well No. 6 and other items necessary for the completion of the work. The proposed work location is outside the Village limits in Maroa Township, Macon County, IL. Each bid must be accompanied by cash, a certified check, bank draft, or a bid bond, duly executed by the bidder as principal and having as surety thereon a surety company approved by the Owner, in the amount of 5% of the bid. Such cash, checks or bid bonds will be returned to all except the three lowest bidders within three days after the opening of bids, and the remaining cash, checks or bid bonds will be returned promptly after the Owner and the accepted bidder have executed the contract, or, if no award has been made within 45 days after the date of opening of bids, upon demand of the bidder any time thereafter, so long as he/she had not been notified of the acceptance of his/her bid. The successful bidder will be required to furnish a satisfactory performance-payment bond in the full amount of the bid or proposal. No bid shall be withdrawn after the opening of bids without the consent of the said Owner for a period of 45 days after the scheduled time of closing bids. The general prevailing rate of wages in the locality for each craft or type of worker or mechanic needed to execute the contract or perform such work, also the general prevailing rate for legal holiday and overtime work, as ascertained by the public body or by the Department of Labor shall be paid for each craft or type of worker needed to execute the contract or to perform such work. A copy of the most recent Illinois Department of Labor Prevailing Wages for Macon County available at the time the Bid Documents were prepared is included therein. The said Village of Forsyth, Illinois reserves the right to reject any or all bids and waive any informalities in bidding.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents