Similar Projects
SOMA Terrace Townhomes
New Construction, Infrastructure
Design
$4,500,000 est. value
Bentonville, AR 72712

Hope Downtown Streetscaping (Tap-19) (S)
Infrastructure
Bidding
$500,000 to $700,000 est. value
Hope, AR

Installation of Adaptive Signal Control Technology
Infrastructure
Bidding
$400,000 est. value
Conway, AR 72034

Shannon Hills Safe Routes to School - Sidewalks
Post-Bid
Alexander, Shannon Hills, AR 72002

Rockport Walking Trail
Infrastructure
Post-Bid
Rockport, AR

2021 Paving Program, Paving of Miscellaneous Street, Trails and Parking Lots
Results
Less than $1,000,000 est. value
Searcy, AR

Bryant Parkway Trail
Results
Bryant, AR

Slaughter Pen West Parking
Renovation, Infrastructure
Pending Verification
Bentonville, AR 72712

Ramsey Village Apartments
New Construction, Alteration
Pending Verification
$21,000,000 est. value
Fayetteville, AR 72704

Main Street - Vandenberg Boulvard (Widening) (Jacksonville) (F)
Infrastructure
Bidding
$500,000 est. value
Jacksonville, AR

Natural Surface Trail Services
Infrastructure
Post-Bid
Rogers, AR

River Mountain Parking Lot Construction
Infrastructure
Results
$11,500 est. value
Little Rock, AR

Construction for ASU Loop Trail Phase 2
Infrastructure
Post-Bid
Jonesboro, AR

Miscellaneous Sidewalk Construction Repair at various locations
Infrastructure
Results
Harrison, AR

Sidewalks and ADA Parking
Infrastructure
Post-Bid
Crossett, AR

Reported 07/01/2022 12:00 AM
Project Title

Sulphur Creek Trails - Phase I

Physical Address View project details and contacts
City, State (County) Heber Springs, AR   (Cleburne County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Major requirements associated with this project are: 1. Mobilization/Demobilization 2. Clearing and Grubbing 3. Install 13,972 LF of 12' wide SB-2 base 4. Install 2,020 TN of 10' wide asphalt trail 5. Install drainage culverts (sizes from 12"-48" dia.) 6. Grading and ditch improvements 7. Install pre-engineered bridges w/ concrete abutments 8. Stormwater Controls 9. 18" Shale base 15' wide (810 CY)

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents