Similar Projects
Jackson Woods Southeast
New Construction
Conception
Jackson, NJ 08527

Ohr Chaim Meir High School
New Construction
Conception
Lakewood, NJ 08701

The Ewing Boutique Hotel
Addition - 19,670 SF
Design
$14,400,000 est. value
West Cape May, NJ 08204

The General's Retreat
New Construction, Renovation - 6,226 SF
Design
Lambertville, NJ 08530

Furnishing of Swimming Pool Repairs, Services and Supplies
Bidding
NJ

On-Call Swimming Pool Maintenance
Term Contract
Bidding
Trenton, NJ 08611

South End Pool and Pavilion Reconstruction
New Construction
Post-Bid
Spring Lake, NJ 07762

Aquatics Rehabilitation and Maintenance Services
Post-Bid
Jersey City, NJ

South Plainfield Community Pool Renovation
Results
South Plainfield, NJ 07080

Snug Harbor Main (large) Pool Resurfacing and Repair
Results
Toms River, NJ

South Beach at Long Branch Condominiums
New Construction, Demolition - 100,000 SF
Construction
$50,000,000 est. value
Long Branch, NJ 07740

Autumn Park at Medford
New Construction - 2,984,000 SF
Construction
$10,000,000 CJ est. value
Medford, NJ 08055

The Place at Marlboro
New Construction - 2,800 SF
Conception
NJ

The Halo
New Construction - 1,171,142 SF
Design
$10,000,000 CJ est. value
Newark, NJ 07102

Various Improvements to Municipal Pool
Post-Bid
Waldwick, NJ 07463

Last Updated 04/22/2020 09:56 AM
Project Title

Swimming Pool Renovation at Phillipsburg Elementary School

Physical Address View project details and contacts
City, State (County) Phillipsburg, NJ 08865   (Warren County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the demolition of the existing pool finishes and the provision and installation of new ceramic tile at the pool perimeter, trench drain, lap lanes and wall targets. The provision and installation of new lap lane cup anchors and Krystalkrete plaster pool finish. The provision and installation of new wall and deck paint as well as new FRP double doors at pump room.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents