Similar Projects
Meadowlands Adaptive Signal System for Traffic Reduction Maintenance
Term Contract
Post-Bid
Lyndhurst, NJ

Furnish and Deliver Econolite 8 Phase Traffic Control Cabinet Assembly Systems and Alpha Technologies FXM1100 (1100W) Battery Backup Systems for the Division of Engineering and Traffic Safety
Post-Bid
Freehold, NJ 07728

Reconstruction of the Ridge Avenue and New Hampshire Avenue Signalized Intersection II
Results
Less than $1,000,000 est. value
Toms River, NJ 08754

Repair and Maintenance of Traffic Signals and Related Equipment for 2019-2021
Term Contract
Results
Tenafly, NJ 07670

Traffic Signal Bases and Poles
Post-Bid
Newark, NJ

2019 On-Call Traffic Signal and Electrical Maintenance Contract
Results
NJ

LED Traffic Signals With Visors
Post-Bid
Woodbridge, NJ

Traffic Safety Improvements at the Intersection of County Route 528 and Oberlin Avenue
Results
$1,000,000 to $5,000,000 est. value
Lakewood, NJ 08701

Purchase of Direct View LED Traffic Controllers at Ben Franklin Bridge
Post-Bid
Camden, NJ

Traffic Surveillance Camera Communication Conversion - Statewide
Term Contract
Results
$5,000,001 to $10,000,000 est. value

Traffic Signal and Electrical Equipment
Post-Bid
Newton, NJ 07860

North 8th Street and Planten Avenue Traffic Signal
Results
Paterson, NJ

Columbia Turnpike and Crescent Road Traffic Signal
Post-Bid
Florham Park, NJ 07932

Traffic Signals
Results
Perth Amboy, NJ 08861

Campus Drive, Campus Drive Jughandle, and Traffic Signal Project
Post-Bid
Florham Park, NJ 07932

Reported 03/13/2019 12:00 AM
Project Title

Traffic Control and Directional Drilling Services

Physical Address View project details and contacts
City, State (County) Vineland, NJ 08360    (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description
Details
Division 33 - Utilities, Common Work Results for Utilities, Trenchless Utility Installation, Utility Horizontal Directional Drilling.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents