Similar Projects
Y1da--Add AHU Metering Louis Stokes VAMC
Design
$1,000,000 to $5,000,000 est. value
Cleveland, OH 44106

Cuyahoga Hills Juvenile Correctional Facility HVAC Replacement
Bidding
$915,000 est. value
Highland Hills, OH 44128

HVAC Technical Services for Forced Air Furnaces
Term Contract
Bidding
Cleveland, OH

Public Auditorium Music Hall Air Handling Units
Post-Bid
Cleveland, OH 44114

King Kennedy North Day Care HVAC Repair or Replacement
Post-Bid
Cleveland, OH 44104

USCG HVAC Maintenance and Repair Ohio
Results
Cleveland, OH 44114

Steam Humidification System Repairs & Replacement of Cooling Tower Fill Project
Results
$250,000 to $500,000 est. value
Cleveland, OH 44113

HVAC Improvements and Upgrades
Post-Bid

HVAC/R Supplies, Items, Materials and Parts
Results
Cleveland, OH 44114

Lubrizol Brecksville - Idea Center Boiler
Renovation
Post-Bid
Brecksville, OH 44141

HVAC System Replacement - City Hall
Results
$550,000 est. value
North Olmsted, OH 44070

RFI Only - NASA Glenn Research Center 9x15 Wind Tunnel Heat Exchanger Bundle Replacement
Post-Bid
Cleveland, OH 44135

HVAC Maintenance Services
Results

The Federal Aviation Administration Logistic Center (FAALC) Requires Drainage Upgrade Around the Cleveland Air Traffic Control Tower Facility and the Replacement of Three Facility Chiller Pumps
Post-Bid
$25,000 to $100,000 est. value
Cleveland, OH 44114

District-Wide HVAC Equipment and Systems Upgrades (1585)
Results
Less than $5,275,000 est. value
Cleveland, OH 44115

Last Updated 11/16/2020 11:27 AM
Project Title

Y--Replacement of AHU-17 & AHU-18 LOUIS STOKES VAMC - CLEVELAND, OH 44106 541-18-104

Physical Address View project details and contacts
City, State (County) Cleveland, OH   (Cuyahoga County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project # 541-18-104: Replace Air Handling Unit AC 17 and AC 18. The goal of the project is to replace the Air Handling Unit AC-17 and AC-18 that serves floors 2 through 6 of the main medical center. The project repairs/replaces the main ducts and the duct shaft. The project addresses identified mechanical condition and security gaps and compliance by complying with VA design guidelines. The project will also verify branch lines to determine capacity of new HVAC units. All plant labor, equipment, materials and incidentals shall be furnished by the Contractor. The Contractor shall perform all work in a manner that will maintain the safe usage of adjacent space for patients, staff and visitors to the Cleveland VAMC at all times. All OSHA and NFPA codes shall be followed.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents