Similar Projects
Well No.10 Treatment Plant Upgrades
Renovation
Bidding
Seaside Park, NJ 08752

Well 2 Filter Plant Upgrades
New Construction
Bidding
Braddock, NJ

Wastewater Treatment Plant Filter and Residuals Building Improvements
Post-Bid
Clinton, NJ 08809

Spring Street and Orchard Place Arsenic Treatment System Facilities
Post-Bid
Ramsey, NJ 07446

Replacement of Reverse Osmosis (RO) Membrane Elements
Results
Keansburg, NJ

WWTP Tertiary Filter Replacement
Results
$397,000 est. value
Flanders, NJ 07836

2019 Reconstruction of Facilities at the Ship Bottom Water Treatment Plant
Construction
Ship Bottom, NJ 08008

Water Treatment Plant Upgrade, Chemical Building Expansion - Phase 2
Construction
Florence, NJ 08518

WWTP Sludge Handling System and Emergency Pump Station Improvements
Renovation, Addition
Bidding
Long Branch, NJ 07740

Water Filtration Plant Filter Media Replacement
Post-Bid
Willingboro, NJ 08046

Wastewater Treatment Plant Unit Substation Maintenance and Testing
Results
Lincoln Park, NJ

Carl J. Olsen Treatment Plant - Upgrades and New Ozone Treatment Facility
New Construction, Renovation
Construction
Edison, NJ 08817

Plant Infrastructure Repairs
Term Contract
Bidding
West Paterson, NJ

Water Plant Upgrades and Restoration
Post-Bid
Galloway, NJ 08205

Peracetic Acid Chemical Feed System
Results
Mount Holly, NJ 08060

Last Updated 07/13/2021 12:54 PM
Project Title

Delaware No. 1 Water Pollution Control Facility Secondary Treatment Sludge Piping Upgrades

Physical Address View project details and contacts
City, State (County) Camden, NJ 08104   (Camden County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $7,500,000 to $10,000,000
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

The Work comprises of furnishing all labor, materials, equipment, and services required for: 1. Removal and disposal of, and modifications to: the existing sludge piping ranging in size from 12" to 36" diameter; existing equipment; electrical, instrumentation and controls located in the Final Tanks Operating Gallery and Aeration Tanks Piping Gallery, as indicated and specified in the Contract Documents; 2. Installation of new sludge piping ranging in size from 12" to 36" diameter and appurtenances; electrical, instrumentation and control systems located in the Final Tanks Operating Gallery and Aeration Tanks Piping Gallery, as indicated and specified in the Contract Documents; 3. Modification and upgrade to the existing electrical and instrumentation system related to the Secondary System Sludge Piping System. 4. Modifications to the existing SCADA system, as required to incorporate to new controls. 5. Maintenance of plant operations.

Details

Division 26 - Electrical.
Division 33 - Utilities, Water Utility Distribution Piping.
Division 46 - Water and Wastewater Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents