Similar Projects
Y1DA--FY21 NRM Tier 2 (PROJ: 573-20-106) DB - Replace Flanged Valves Hospital Wide
Design
$1,000,000 to $5,000,000 est. value
Gainesville, FL 32608

Unit No. 8 GE FS7E Exhaust Silencer Panel(S) Modifications and Repairs
Bidding
Lakeland, FL 33801

Water Heaters
Term Contract
Bidding
Tallahassee, FL

Grizzle Building, Replace Generator, Chiller Pumps, and Air Handling Units
Post-Bid
$2,000,000 est. value
Largo, FL

Ground Transportation Facility GMP 8S.1
Post-Bid
Orlando, FL 32827

Water Treatment Plant Nano Filtration Membrane Replacement
Results
Hallandale, FL 33009

FSU Facilities and FSU Mag/Lab HVAC PM and Minor Repairs Services
Results
Tallahassee, FL

Indian River State College Main Campus Chiller Plant Building-X Upgrades Project
Construction
Fort Pierce, FL 34981

Thomas C. Kelly Fountain Rehabilitation
Alteration
Bidding
Less than $202,802 est. value
DeLand, FL 32720

J041--Steam Station Regulator and Piping - Replace/Repair
Post-Bid
Miami, FL 33125

Santa Rosa County Jail Geothermal Renovation Project
Results
Milton, FL 32583

Cleaning of Aeration Basin Influent Channel
Alteration
Bidding
Miramar, FL 33027

Closed Loop Cooling Water Treatment Service
Post-Bid
Key West, FL

Mechanical Services on Stormwater Pump Stations
Results
Weston, FL 33326

Water Fountain and Feature Maintenance
Term Contract
Bidding
The Villages, FL

Last Updated 06/17/2021 05:56 AM
Project Title

Volusia County Correctional Facility Kitchen Cooler Replacement

Physical Address View project details and contacts
City, State (County) Daytona Beach, De Land, FL 32723   (Volusia County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $55,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Awarded contractor will be responsible for: -Permitting if required -Coordination with owner and supplier -Ordering and taking delivery of attached freezer / cooler system -Reconnecting all electrical -Reconnecting all refrigerant lines -Testing and inspection protocols as per manufacturer recommendations. -Installation must meet manufacturer warranty standards, installation requirements and recommendations. Contractor must be experienced with the design, installation, and system provided.

Details

Division 01 - General Requirements, Equipment and Furnishings Performance Requirements.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Walk-In Coolers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents