Similar Projects
Automated Metering Infrastructure
Bidding
Temple, GA

Scott Boulevard Watermain Replacement Phase III
Bidding
Decatur, GA

Lafayette Road Water Line Replacement
Post-Bid
Fort Oglethorpe, GA 30742

Quick Insertion Valves
Term Contract
Post-Bid
Decatur, GA 30030

Linwood Water Reclamation Facility Diffuser
Results
Gainesville, GA 30501

Crawford Lane Water Main Upgrade Project
Results
Valdosta, GA

FY 2020 CDBG Water System Improvement
Infrastructure
Bidding
Shiloh, GA

Two Eighteen Inch Check Valves - Gornto Road
Post-Bid
Valdosta, GA 31602

Biennial Unit Labor Contract 2019
Results
Blue Ridge, GA 30513

Powder Springs Street Improvements Water Sewer Relocation
Infrastructure
Bidding
Marietta, GA 30006

Southeast Oconee Pressure Zone Water System Improvements
Post-Bid
Watkinsville, GA 30677

Contract C - Water Main Extensions
Results
Fort Valley, GA 31030

Water System Improvements
Infrastructure
Bidding
Blairsville, GA

SR-144 and I-95 Water and Sewer Relocations
Post-Bid
Richmond Hill, GA 31324

Manget Street at Lakewood Drive Water and Sanitary Sewer Relocation
Results
Less than $357,198 est. value
Marietta, GA 30060

Last Updated 07/12/2021 08:16 AM
Project Title

Canal Road to Glynco Parkway Water Main Extension

Physical Address View project details and contacts
City, State (County) Brunswick, GA   (Glynn County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract consists of furnishing all labor, materials, tools, equipment and incidentals required to construct complete in place and ready to install approximately 600 LF of 12-inch HDPE water main along Glynco Parkway via horizontal direction drill and connection to existing JWSC installed water main stub on Glynco Parkway. More specifically the scope of work includes, but is not limited to: Excavation, Dewatering Backfill, Traffic Control and Compaction Erosion and sedimentation controls Installation of approximately 600 LF of (12)-inch HDPE DR11 water main carrier and (24)-inch HDPE DR21 casing by horizontal directional drill with associated fittings and appurtenances Connection to existing JWSC water main stub(s) Testing and disinfection Complete site restoration All installation to include appropriate associated fittings, tracer wire, detection tape, erosion and sedimentation control, temporary and final grassing.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents