Similar Projects
Amazon Warehouse
New Construction - 750,000 SF
Conception
$10,000,000 CJ est. value
Lakeville, MN

The Farm Mini Storage
New Construction - 34,800 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Cambridge, MN 55008

Mickelson Invesments Building
New Construction - 12,700 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Clearwater, MN

Inverpoint Business Center - Building 3
New Construction - 107,838 SF
Design
$10,000,000 CJ est. value
Inver Grove Heights, MN 55076

Dodge County Highway Maintenance Facility
Renovation, Addition
Bidding
Dodge Center, MN 55927

Material Recovery Building
Addition
Bidding
Detroit Lakes, MN 56501

MNDOT Mnroads Barn Insulation
Post-Bid
Monticello, Otsego, MN 55301

DOMOPS Storage Building
New Construction
Post-Bid
$1,000,000 to $5,000,000 est. value
Duluth, MN 55811

MnDOT Sleepy Eye Truck Station-General
Results
Less than $4,400,000 est. value
Sleepy Eye, MN 56085

Moose Lake Truck Station Campus - General
Results
Less than $3,250,000 est. value
Moose Lake, MN 55767

Freeborn-Mower Cooperative Services Headquarters
New Construction - 97,800 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Albert Lea, MN

MnDOT Northfield Truck Station Campus - General
New Construction
Construction
$4,674,000 est. value
Northfield, MN 55057

Crossroads Mall Climate Controlled Storage
Renovation, Build-Out, Alteration - 10,600 SF
Pending Verification
Hastings, MN 55033

Warehouse
New Construction - 210,400 SF
Pending Verification
Rosemount, MN 55068

Scannell Properties Office and Warehouse
New Construction - 305,000 SF
Conception
$10,000,000 CJ est. value
Maple Grove, MN 55369

Reported 12/01/2021 03:58 PM
Project Title

Willmar Industrial Park Distribution Facility

Physical Address View project details and contacts
City, State (County) Willmar, MN   (Kandiyohi County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Owner to Subcontract.
Project Status Construction Commenced November 2021, Sitework Commenced November 2021
Bids Due View project details and contacts
Estimated Value $26,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Warehouse/Storage, 217,000 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents