Similar Projects
HVAC System Cleaning - Group 5 Schools
Alteration
Bidding
Saint Louis, MO

HVAC System Cleaning - Group 1 Schools Ashland, Bryan Hill, Busch and Dewey Schools
Alteration
Bidding
Saint Louis, MO

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Cypress Swamp HVAC Replacement 2021
Results
Saint Louis, MO

Cooling Tower and Closed Systems Water Treatment
Alteration
Results
MO

Lemay 1 Pump Station (P-301) Cooling Tower Replacement
Alteration
Bidding
$1,293,000 est. value
Saint Louis, MO

Miriam Academy HVAC Replacement
Alteration
Post-Bid
Saint Louis, MO 63132

Penguin Puffin Coast HVAC Improvements Project
Alteration
Results
Saint Louis, MO 63110

HVAC, On-Call Maintenance and Repair Service
Term Contract
Post-Bid
Crestwood, MO

2021 Hazelwood Temperature Controls System Project
Alteration
Results
Hazelwood, MO 63042

Facilities Maintenance Services
Infrastructure, Alteration
Post-Bid
Saint Louis, MO

Saint Louis Zoo Sears Lehmann, Jr. Wildlife Reserve Walk-in Freezer
Alteration
Results
Saint Louis, MO

Saint Louis VAMC Fire Extinguisher Inspection and Certification
Term Contract
Post-Bid
Jacksonville, Shiloh, IL - Creve Coeur, Florissant, O'Fallon, Saint Louis, Washington, MO 63110

TJ Library - Replace Chiller No. 2
Alteration
Results
Less than $563,000 est. value
Saint Louis, MO

Last Updated 06/24/2022 01:35 AM
Project Title

HVAC Replacement at Cross Keys Middle School

Physical Address View project details and contacts
City, State (County) Florissant, MO 63033   (Saint Louis County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The complete replacement of the existing mechanical system at Cross Keys Middle School. The existing mechanical system consists of a Daikin VRF system. The new system will consist of new VRF cooling and heating and addition of dampers to existing ducted outside air distribution

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents