Similar Projects
Clark High School - Fine Arts Replacement- 2022 Bond - Northside Independent School District
New Construction, Renovation, Infrastructure
Conception
$56,900,000 CJ est. value
San Antonio, TX 78249

Clark High School - Fine Arts Replacement- 2022 Bond - Northside Independent School District
New Construction, Renovation, Infrastructure
Conception
$56,900,000 CJ est. value
San Antonio, TX 78249

Burbank High School - 2020 Bond - Category 2 - San Antonio Independent School District (SAISD)
New Construction, Renovation, Infrastructure
Design
$19,318,760 CJ est. value
San Antonio, TX 78205

Remedial Repair Attoyac Bayou Site 21
Infrastructure
Design
$250,000 CJ est. value
Nacogdoches, TX 75961

2018 Street Bond Projects - Phase II
Infrastructure
Post-Bid
$1,900,000 CJ est. value
Kirby, TX 78219

JR HS Athletics Facilities Project - Football Field Improvements
Renovation
Post-Bid
Von Ormy, TX 78069

Emergency Response Road Improvment (Perimeter Road Package 4) (San Antonio International Airport)
Infrastructure - 109,555 SF
Results
$2,325,718 CJ est. value
San Antonio, TX 78223

Morgan Meadows Unit 1C, Unit 2C, Unit 3C, Talley Road Extension and Morgan Heights Phase 2A
Infrastructure
Results
San Antonio, TX

Package 2 SAWS NE Operation Center and NE Service Center
New Construction, Infrastructure
Construction
$250,000 CJ est. value
San Antonio, TX 78205

Waters Edge I / Building A
New Construction, Infrastructure - 105,702 SF
Construction
$18,600,000 CJ est. value
San Antonio, TX 78235

Alamo Visitor Center and Museum
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
San Antonio, TX 78205

Nicha's Comida Mexicana
New Construction, Infrastructure - 7,805 SF
Pending Verification
$2,000,000 CJ est. value
San Antonio, TX 78214

Roof Top Unit Replacements (5 sites) - 2022 Bond - Northside Independent School District
Infrastructure
Conception
$9,400,000 CJ est. value
San Antonio, TX 78205

SOFTBALL FIELD UPGRADE
Infrastructure
Design
$300,000 CJ est. value
San Antonio, TX 78224

South Alamo Street (Market Street to Cesar Chavez Boulevard)
Infrastructure
Post-Bid
$22,880,631 CJ est. value
San Antonio, TX 78204

Last Updated 06/09/2023 11:37 AM
Project Title

Hemisfair Civic Park Phase 2

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78205   (Bexar County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $28,404,905 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project (23-03746) - This project provides funding for continuing the restoration of historic buildings, a civic park, landscaping, and other improvements. This project is based on the park's master plan. This project is included in the city's 2022-2027 Capital Improvement Plan (CIP). As of January 3, 2023, a design architect has been selected. The City is currently soliciting requests and proposals for a contractor. Bids will be due February 14, 2023. The City Council will award the project in May 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. The estimated cost of construction is $15,800,000. The Project consists of construction of a premier urban park in the heart of downtown San Antonio. This construction project includes, but is not limited to, the construction of sidewalks, plazas, gardens, ramps, retaining walls, custom metal work including handrails, stone fabrication, water features, structural soils systems, paving systems, electrical infrastructure and park lighting systems, plumbing infrastructure, grading and drainage, tree and shrub planting, grass planting, irrigation systems, park furniture installation, and any other work required for the completion of the project as designed in the project plans and specifications. Respondent must submit questions concerning this RFCSP through the online until January 18, 2023, at 4:00 p.m. CT, Questions received after the stated deadline will not be answered.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents