Similar Projects
Shoulder Widening, Modify Intersection
Infrastructure
Conception
$19,905,000 CJ est. value
Deadwood, SD 57732

Spearfish Regional Hospital Addition/Renovation
Addition, Demolition, Infrastructure, Renovation - 91,000 SF
Conception
$50,000,000 CJ est. value
Spearfish, SD 57783

Signing and Delineation - Gravel Roads
Infrastructure
Design
$1,100,000 CJ est. value
Deadwood, SD 57732

Miller Street Parking Garage - City of Deadwood
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Deadwood, SD 57732

Asphalt Concrete Shared Use Path
Infrastructure
Post-Bid
$902,739 CJ est. value
North Lawrence, SD 57783

Summit at Deadwood Stage Run Addition
Infrastructure
Post-Bid
$500,000 CJ est. value
Deadwood, SD 57732

2023 Nemo Road Mill and Overlay Phase I
Infrastructure
Results
$1,401,646 CJ est. value
Nemo, SD 57759

Manuel Brothers Park Shelter Improvement - City of Lead
Infrastructure
Pending Verification
$2,000,000 CJ est. value
Lead, SD 57754

US14A - Replace Ice Box Creek Box Culvert 0.2 Miles East of Cheyenne Crossing - South Dakota Department of Transportation
Infrastructure
Pending Verification
$2,000,000 CJ est. value
Deadwood, SD 57732

Jackson Boulevard Street Water Improvements - City of Spearfish
Infrastructure
Conception
$459,759 CJ est. value
Spearfish, SD 57783

Structure and Approach Grading - Bridge Improvement Grant
Infrastructure
Design
$2,140,000 CJ est. value
Spearfish, SD 57783

Spearfish High School Tennis Courts Resurfacing Project
Infrastructure
Post-Bid
$60,000 CJ est. value
Spearfish, SD 57783

McGuigan Road Water Main - City of Spearfish
Infrastructure
Conception
$1,383,574 CJ est. value
Spearfish, SD 57783

Sewer Lift Station on Yukon Street - City of Spearfish
Renovation, Infrastructure
Conception
$349,673 CJ est. value
Spearfish, SD 57783

Headworks Building at Wastewater Treatment Plant - City of Spearfish
Renovation, Infrastructure
Conception
$475,789 CJ est. value
Spearfish, SD 57783

Last Updated 12/27/2022 03:01 PM
Project Title

Elkhorn Ridge Well And Storage Tank (Construction Phase 1) - City of Spearfish

Physical Address View project details and contacts
City, State (County) Spearfish, SD 57783   (Lawrence County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. This project is in included in the City of Spearfish FY 2021-2026 Capital Improvement Plan (CIP). As of December 27, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents