Similar Projects
Utilities - US 77
Infrastructure
Conception
$1,250,000 CJ est. value
Noble, OK 73068

Utilities - US 77
Infrastructure
Conception
$1,250,000 CJ est. value
Noble, OK 73068

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Utilities - SH 9
Infrastructure
Design
$545,000 CJ est. value
Norman, OK 73071

District 2 Luther Road Bridge Repair (N Canadian River & Railroad Bridge)
Infrastructure
Bidding
$3,000,000 CJ est. value
Oklahoma City, OK 74857

District 2 Luther Road Bridge Repair (N Canadian River & Railroad Bridge)
Infrastructure
Bidding
$3,000,000 CJ est. value
Oklahoma City, OK 74857

RFQ - University of Oklahoma (OU) First - Year Housing - Demolition
Demolition, Infrastructure
Sub-Bidding
$3,000,000 CJ est. value
Norman, OK 73072

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Slabjacking and Subsealing Services
Infrastructure
Results

Tumer Avenue Improvements
Infrastructure
Results
Moore, OK

Summit Valley Interceptor - City of Norman
Infrastructure
Pending Verification
$284,600 CJ est. value
Norman, OK 73069

Summit Valley Interceptor - City of Norman
Infrastructure
Pending Verification
$284,600 CJ est. value
Norman, OK 73069

Technology Place Street Extension - TR0120 - City of Norman
Infrastructure
Conception
$550,000 CJ est. value
Norman, OK 73071

Interchange - IS 35
Infrastructure
Design
$20,000,000 CJ est. value
Norman, OK 73069

Last Updated 01/26/2023 11:37 PM
Project Title

Grade, Drain and Surface - IS 35

Physical Address View project details and contacts
City, State (County) Norman, OK 73069   (Cleveland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

I-35 Frontage: Operational Improvement From Sw 34th Street to Sw 19th Street in Moore. As of January 27, 2023, the project is in Final Planning status. Anticipated letting month/year is April, 2023. Length : 1.700 Mi OKDOT - Grade, Drain and Surface - IS 35 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents