Similar Projects
2" Galvanized Water Main Replacements
Infrastructure
Bidding
$1,100,000 est. value
Little Rock, AR

Balboa Gate Emergency Connection Water Line
Alteration
Bidding
Garfield, AR

Water Project
Post-Bid
Less than $166,000 est. value
Nashville, AR

Water System Improvements: Contract II - Water Line Extension and Chlorination Facility
Post-Bid
El Dorado, AR

Water Quality Demonstration
Results
Less than $1,412,520 est. value
Conway, AR 72032

Raw Water Supply Transmission Pipeline Contract 5
Results
Less than $11,200 est. value
Hot Springs, AR

Installation of 12inch Diameter Ductile Iron Pipe Crossing I-40 Harris Road
Infrastructure
Bidding
Little Rock, AR 72223

Highway I-49 18 Water Main Extension
Infrastructure
Post-Bid
Rogers, AR

Highway 9 Water Line Relocation
Results
Salem, AR

Construction - Township Pump Station and Waterline
New Construction, Infrastructure
Bidding
Fayetteville, AR

Dierks Water and Sewer Improvements
Infrastructure
Post-Bid
$165,000 est. value
Dierks, AR

Stone Links - Multi-Pipe Maintenance Rehabilitations
Infrastructure
Results
North Little Rock, AR

Chestnut Sewer and Water
Infrastructure
Bidding
Rogers, AR

2021 Water Main Extensions
Infrastructure
Post-Bid
Searcy, AR

Construction of the Highway 141 Water Line Relocation
Infrastructure
Results
Paragould, AR

Reported 02/16/2022 12:00 AM
Project Title

Production Line Upgrades

Physical Address View project details and contacts
City, State (County) White Hall, AR 71602   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Purchase/install a new hot water supply system, waste water storage tanks for a waste water system, and a possible Option purchase/install of replacement robots for the 2 ABB Model IRB 6600 M2004 robots on PBA's production line 5. This procurement includes the demolition of old equipment and the supply, installation, testing, and training of the new equipment and systems. The work to be performed consists of facility preparation, moving, installing, and restoring to operation the Government Furnished Equipment (GFE) and furnishing all other materials, equipment, supplies, labor and transportation to complete and make the production process fully operational within the facility. Work required shall be performed accordance with the specifications and drawings that will be provided at the time of solicitation issuance. Final acceptance will be based on the systems performance after installation at PBA and shall be evaluated against the acceptance criteria referenced within the solicitation. Operator and maintenance training shall be provided by the contractor for this system after acceptance.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents