Similar Projects
Tampa Union Station RTU-7 AC Replacement
Post-Bid
Tampa, FL 33602

Replace Air Conditioning Unit at Parks Administration Building
Post-Bid
Plant City, FL 33563

FDOT HVAC Install: Sneads WB Weigh Station
Results

HVAC Direct Digital Control System Service
Term Contract
Results
Less than $55,000 est. value
FL

RTU-2 Rooftop Unit Installation, TSS Building E
Post-Bid
Tampa, FL 33605

HVAC System and Repair (Supplemental Vendors)
Term Contract
Results
Less than $5,000 est. value
Tampa, FL 33601

HVAC Cooling Tower Replacement
Post-Bid
Tampa, FL 33600

Citywide HVAC Services
Term Contract
Results
Tampa, FL 33602

HVAC Redundancy at Palm Terrace Assisted Living Facility and Adult Day Care Facility
Post-Bid
Tampa, FL 33617

4420--Supply: Repair Heater Exchanger Repair and Installation
Results
Tampa, FL

Airside F Air Handler Replacement
Post-Bid
Tampa, FL 33607

J065--FY-20 Chiller Maintenance at the James A. Haley Vetrans Hospital Tampa FL
Results
Tampa, FL

Hvac Preventative Maintenance Services
Post-Bid
Clewiston, Fort Pierce, Hollywood, Immokalee, Naples, Okeechobee, Tampa, FL 33024

Furnish and Install HVAC Systems at ITS Equipment Shelter Locations
Results

HVAC and Mechanical Products
Term Contract
Post-Bid

Last Updated 01/02/2020 07:34 AM
Project Title

Furnish and Install AC Units at Utilities Administration Building

Physical Address View project details and contacts
City, State (County) Plant City, FL   (Hillsborough County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, materials, supervision, equipment, tools, transportation and supplies necessary to install the Air Conditioning Unit Packages at the Utilities Administration Building located at 1802 Spooner Drive, Plant City, Florida 1. Furnish and install ductless mini-split HVAC for the OPS Control Room and after new units are operational, take the room off the central system. Provide a ductless mini-split HVAC for the Electrical/IT Room to supplement the existing split system. Provide controls such that the new mini-split system is the primary system with the existing cycling on and off as needed. Install vent to exterior. 2. Rebalance all HVAC systems and ensure the building is positive pressurized. 3. Rebalance exhaust fans and/or supply diffusers in Restroom and Locker Rooms to make spaces negative pressurized. 4. Provide booster fan to bring fresh air to the Mechanical Room return plenum. 5. Insulate the supply ductwork passing through the hallway to the Electrical/IT room to prevent condensation.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents