Similar Projects
Lead Water Service Line Replacements
Term Contract
Post-Bid
Newburgh, NY 12550

Cumberland Avenue Pump Station CSO Upgrades
Post-Bid
Plattsburgh, NY 12901

Shether Street Water Main Replacement Project
Results
Less than $280,000 est. value
Hammondsport, NY

Shared Water Improvements
Results
Less than $115,000 est. value
Champlain, NY

Wastewater Pump Station Improvements
Post-Bid
Poughkeepsie, NY 12602

Installation of Cone Valves at East Delaware Tunnel Outlet
Results
$721,650 to $976,350 est. value
Neversink, NY 12765

WPCP Low Lift Pump Improvements
Post-Bid
Poughkeepsie, NY 12601

Melody Lake Water District Watermain Replacement Project
Results
Thompson, NY 12834

Water Hydrants, Pipe and Valves
Post-Bid
Jamestown, NY 14701

Hyde Park Phase 2 Water Meter
Results
Poughkeepsie, NY

Hot Water Supply Repair
Post-Bid
Binghamton, NY 13904

Chelsea Service Line Connections and Road Repaving
Results
Wappingers Falls, NY

Consolidated Water District No. 1 Water System Repairs and Service Installations
Post-Bid
East Syracuse, NY 13057

2019 Boyce Park and Dover Plains Library Water System Modifications
Results
Dover Plains, NY 12522

Furnish and Install Various Sized Line Stops on Existing Cast Iron Water Distribution Pipes within the City on an As-Needed Basis (AS)
Term Contract
Post-Bid
Yonkers, NY 10701

Reported 09/22/2020 10:16 AM
Project Title

Sleepy Hollow Water District Improvements and Extension No 1

Physical Address View project details and contacts
City, State (County) Chittenango, NY 13037   (Madison County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Lines
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project will consist of approximately 2,900 LF of new 8-inch ductile iron water main, associated appurtenances, and a 15 by 20 booster pump station building with 10 HP duplex pump skid. An existing community well will be decommissioned and removed.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents