Similar Projects
Primary Metering Cabinets
Alteration
Bidding
Wellesley, MA

Substation 13.8Kv Indoor Switchgear
Alteration
Bidding
$3,300,000 est. value
Norwood, MA

Improvements to Substation 495 - Sub-Bids
Alteration
Sub-Bidding
$295,000 est. value
Norwood, MA 02062

Mccormack Building, 8th Floor Reconfiguration - Sub-Bids
Alteration
Sub-Bidding
$836,406 est. value
Boston, MA

Water and Sewer Department Preventative Maintenance and OnCall Generator Services Contract
Post-Bid
Less than $45,000 est. value
Franklin, MA

Interior and Exterior Lighting Upgrades of 833 Interior and 50 Exterior Fixtures at the Bellingham High School
Post-Bid
Less than $150,000 est. value
Bellingham, MA 02019

Three Phase Padmount Transformers
Results
Wellesley, MA 02481

FY20 Lighting Upgrade Project
Results
Less than $650,000 est. value
Wellesley, MA 02482

Substation 495 Relay and Control Panels
Alteration
Bidding
$300,000 est. value
Norwood, MA

VFD Replacement Project
Post-Bid
Walpole, MA 02081

Electrical Repairs and Upgrades - Rose Forte
Results
Stoughton, MA

Energy Management Services for Exterior Lighting
Alteration
Bidding
$4,000,000 est. value
Boston, MA

Leonard Road and Chandler Drive Pump Station Improvement - Filed Sub Bids
Post-Bid
$476,000 est. value
Walpole, MA 02081

Pedestrian Lights at the Heights
Results
Less than $50,000 est. value
Needham, MA 02492

Maintenance and Repair Projects - Potter II and Watson Generating Stations, On an as-Needed Basis
Alteration
Bidding
$160,000 est. value
Braintree, MA

Reported 07/07/2021 12:00 AM
Project Title

Hurley/Lindemann Building Cooling Separation - Sub-Bids

Physical Address View project details and contacts
City, State (County) Boston, MA   (Norfolk County)
Category(s) Single Trades
Sub-Category(s) Electric, Steel
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $1,455,652
Plans Available from State Agency - 06/16/21
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate. This project involves separating the existing cooling systems of the Hurley and Lindemann buildings by installing a new chiller in the existing Lindemann Building mechanical room. Work includes all operations necessary to deliver the chiller in a fully-installed and operable condition, and installing a platform on the roof surrounding the existing cooling tower.

Details

Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Fabrications.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents