Similar Projects
Taylor Lane Improvements
Infrastructure
Bidding
$12,397,175 est. value
Austin, TX 78702

US0183 - Crack Seal
Infrastructure
Bidding
$121,788 est. value
TX

Park Side on the River Phase 1A
Post-Bid
Austin, TX

Bryson Phase 2, Section 3, Public Improvement Construction Plans Water, Wastewater, Drainage and Paving Improvements
Post-Bid
Leander, TX 78641

Southern Region Disaster Recovery Support BPA
Results

Sun Chase South Sections 6 and 7 - Streets, Drainage, Water, Wastewater and Erosion Control Improvements
Results
Austin, TX 73301

2021 Street Maintenance Program B - Round Rock West and Southcreek
Infrastructure
Bidding
Round Rock, TX

Balcones Asphalt Paving
Post-Bid
$35,000 to $45,000 est. value

System-Wide Performance Based Maintenance Contract
Term Contract
Results
Less than $51,426,072 est. value
Austin, TX 78705

Construction of Salerno Phase 6
Infrastructure
Bidding
TX

Paving Drainage Water and Wastewater Improvements Phase 3
Post-Bid
Austin, TX 73301

Miscellaneous Street Rehabilitation (Asphalt Surface) IDIQ Project
Term Contract
Results
Austin, TX 73301

Construction of Salerno Phase 8
Infrastructure
Bidding
TX

Spanish Oaks Golf Club Site and NPS Plan
Post-Bid
Bee Cave, TX 78738

183A Phase III Project - Construction Engineering & Inspection Services
Results
Less than $180,000,000 est. value
Austin, TX 78705

Last Updated 08/06/2021 08:12 AM
Project Title

IH 35-Preventive Maintenance

Physical Address View project details and contacts
City, State (County) TX   (Travis County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,746,697
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing Row Sta 155.000 1 110 6001 Excavation (Roadway) Cy 2,405.000 2 132 6003 Embankment (Final)(Ord Comp)(Ty B) Cy 3,152.000 3 134 6001 Backfill (Ty A) Sta 236.000 4 160 6003 Furnishing And Placing Topsoil (4") Sy 22,077.000 5 164 6029 Cell Fbr Mlch Seed(Temp)(Warm) Sy 22,077.000 6 164 6031 Cell Fbr Mlch Seed(Temp)(Cool) Sy 22,077.000 7 168 6001 Vegetative Watering Mg 524.570 8 169 6001 Soil Retention Blankets (Cl 1) (Ty A) Sy 22,077.000 9 247 6366 Fl Bs (Cmp In Plc)(Ty A Gr 5)(Fnal Pos) Cy 6,708.000 10 310 6001 Prime Coat (Multi Option) Gal 1,426.000 11 347 6001 Tom (Asphalt) Pg 76-22 Ton 1,446.470 12 347 6006 Tom - C (Aggregate) Sac - B Ton 21,332.360 13 351 6002 Flexible Pavement Structure Repair(6") Sy 63,527.000 14 354 6001 Plan & Text Asph Conc Pav(0" To 1") Sy 248,785.000 15 354 6023 Plane Asph Conc Pav(0" To 4") Sy 143,795.770 16 416 6032 Drill Shaft (Trf Sig Pole) (36 In) Lf 50.000 17 416 6034 Drill Shaft (Trf Sig Pole) (48 In) Lf 35.000 18 438 6004 Cleaning And Sealing Exist Joints(Cl7) Lf 348.000 19 454 6008 Header Type Expansion Joint Cf 59.500 20 454 6009 Joint Sealant Lf 356.000 21 464 6005 Rc Pipe (Cl Iii)(24 In) Lf 396.000 22 467 6395 Set (Ty Ii) (24 In) (Rcp) (6: 1) (P) Ea 7.000 23 500 6001 Mobilization Ls 1.000 24 502 6001 Barricades, Signs And Traffic Handling Mo 6.000 25 506 6038 Temp Sedmt Cont Fence (Install) Lf 3,170.000 26 506 6039 Temp Sedmt Cont Fence (Remove) Lf 3,170.000 27 529 6001 Conc Curb (Ty I) Lf 310.000 28 530 6004 Driveways (Conc) Sy 473.000 29 530 6005 Driveways (Acp) Sy 157.000 30 536 6002 Conc Median Sy 87.000 31 618 6046 Condt (Pvc) (Sch 80) (2") Lf 315.000 32 618 6053 Condt (Pvc) (Sch 80) (3") Lf 790.000 33 618 6054 Condt (Pvc) (Sch 80) (3") (Bore) Lf 620.000 34 620 6007 Elec Condr (No.8) Bare Lf 1,585.000 35 620 6008 Elec Condr (No.8) Insulated Lf 1,280.000 36 620 6009 Elec Condr (No.6) Bare Lf 65.000 37 620 6010 Elec Condr (No.6) Insulated Lf 130.000 38 624 6001 Ground Box Ty A (122311) Ea 2.000 39 624 6007 Ground Box Ty C (162911) Ea 2.000 40 624 6010 Ground Box Ty D (162922)W/Apron Ea 5.000 41 628 6165 Elc Srv Ty D 120/240 070(Ns)Al(E)Sp(O) Ea 2.000 42 636 6001 Aluminum Signs (Ty A) Sf 103.500 43 644 6001 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(P) Ea 7.000 44 644 6004 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(T) Ea 6.000 45 644 6007 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(U) Ea 1.000 46 644 6068 Relocate Sm Rd Sn Sup&Am Ty 10bwg Ea 8.000 47 644 6076 Remove Sm Rd Sn Sup&Am Ea 2.000 48 658 6010 Instl Del Assm (D-Sw)Sz 2(Wc)Gnd Ea 2.000 49 662 6001 Wk Zn Pav Mrk Non-Remov (W)4"(Brk) Lf 21,582.000 50 662 6004 Wk Zn Pav Mrk Non-Remov (W)4"(Sld) Lf 21,100.000 51 662 6012 Wk Zn Pav Mrk Non-Remov (W)8"(Sld) Lf 27,005.000 52 662 6034 Wk Zn Pav Mrk Non-Remov (Y)4"(Sld) Lf 76,775.000 53 662 6072 Wk Zn Pav Mrk Remov (W)12"(Lndp) Lf 684.000 54 662 6109 Wk Zn Pav Mrk Sht Term (Tab)Ty W Ea 4,620.000 55 662 6110 Wk Zn Pav Mrk Sht Term (Tab)Ty Y Ea 2,803.000 56 666 6029 Refl Pav Mrk Ty I (W)8"(Dot)(090mil) Lf 293.000 57 666 6030 Refl Pav Mrk Ty I (W)8"(Dot)(100mil) Lf 283.000 58 666 6035 Refl Pav Mrk Ty I (W)8"(Sld)(090mil) Lf 15,537.000 59 666 6036 Refl Pav Mrk Ty I (W)8"(Sld)(100mil) Lf 11,468.000 60 666 6038 Refl Pav Mrk Ty I (W)12"(Lndp)(090mil) Lf 684.000 61 666 6042 Refl Pav Mrk Ty I (W)12"(Sld)(100mil) Lf 839.000 62 666 6047 Refl Pav Mrk Ty I (W)24"(Sld)(090mil) Lf 2,166.000 63 666 6048 Refl Pav Mrk Ty I (W)24"(Sld)(100mil) Lf 1,203.000 64 666 6053 Refl Pav Mrk Ty I (W)(Arrow)(090mil) Ea 77.000 65 666 6054 Refl Pav Mrk Ty I (W)(Arrow)(100mil) Ea 23.000 66 666 6057 Refl Pav Mrk Ty I(W)(Dbl Arrow)(100mil) Ea 15.000 67 666 6063 Refl Pav Mrk Ty I(W)(Uturn Arw)(100mil) Ea 3.000 68 666 6077 Refl Pav Mrk Ty I (W)(Word)(090mil) Ea 51.000 69 666 6078 Refl Pav Mrk Ty I (W)(Word)(100mil) Ea 25.000 70 666 6092 Refl Pav Mrk Ty I (W)(Rr Xing)(090mil) Ea 3.000 71 666 6099 Ref Pav Mrk Ty I(W)18"(Yld Tri)(100mil) Ea 13.000 72 666 6101 Ref Pav Mrk Ty I(W)36"(Yld Tri)(090mil) Ea 56.000 73 666 6167 Refl Pav Mrk Ty Ii (W) 4" (Brk) Lf 21,582.000 74 666 6170 Refl Pav Mrk Ty Ii (W) 4" (Sld) Lf 81,270.000 75 666 6176 Refl Pav Mrk Ty Ii (W) 8" (Dot) Lf 576.000 76 666 6178 Refl Pav Mrk Ty Ii (W) 8" (Sld) Lf 27,005.000 77 666 6179 Refl Pav Mrk Ty Ii (W) 12" (Lndp) Lf 684.000 78 666 6180 Refl Pav Mrk Ty Ii (W) 12" (Sld) Lf 839.000 79 666 6182 Refl Pav Mrk Ty Ii (W) 24" (Sld) Lf 3,369.000 80 666 6184 Refl Pav Mrk Ty Ii (W) (Arrow) Ea 100.000 81 666 6185 Refl Pav Mrk Ty Ii (W) (Dbl Arrow) Ea 15.000 82 666 6187 Refl Pav Mrk Ty Ii (W) (Uturn Arrow) Ea 3.000 83 666 6192 Refl Pav Mrk Ty Ii (W) (Word) Ea 76.000 84 666 6196 Refl Pav Mrk Ty Ii (W) (Rr Xing) Ea 3.000 85 666 6198 Refl Pav Mrk Ty Ii (W) 18" (Yld Tri) Ea 13.000 86 666 6199 Refl Pav Mrk Ty Ii (W) 36" (Yld Tri) Ea 56.000 87 666 6205 Refl Pav Mrk Ty Ii (Y) 4" (Brk) Lf 5,380.000 88 666 6207 Refl Pav Mrk Ty Ii (Y) 4" (Sld) Lf 76,775.000 89 666 6283 Ref Prof Pav Mrk Ty I(W)4"(Sld)(090mil) Lf 70,546.000 90 666 6287 Ref Prof Pav Mrk Ty I(Y)4"(Sld)(090mil) Lf 50,241.000 91 666 6291 Ref Prof Pav Mrk Ty I(Y)4"(Brk)(090mil) Lf 5,380.000 92 666 6299 Re Pm W/Ret Req Ty I (W)4"(Brk)(090mil) Lf 10,802.000 93 666 6300 Re Pm W/Ret Req Ty I (W)4"(Brk)(100mil) Lf 10,780.000 94 666 6302 Re Pm W/Ret Req Ty I (W)4"(Sld)(090mil) Lf 860.000 95 666 6303 Re Pm W/Ret Req Ty I (W)4"(Sld)(100mil) Lf 14,846.000 96 666 6315 Re Pm W/Ret Req Ty I (Y)4"(Sld)(100mil) Lf 21,552.000 97 672 6006 Refl Pav Mrkr Ty I-A Ea 237.000 98 672 6007 Refl Pav Mrkr Ty I-C Ea 699.000 99 672 6009 Refl Pav Mrkr Ty Ii-A-A Ea 1,289.000 100 672 6010 Refl Pav Mrkr Ty Ii-C-R Ea 1,408.000 101 680 6002 Install Hwy Trf Sig (Isolated) Ea 2.000 102 682 6001 Veh Sig Sec (12")Led(Grn) Ea 12.000 103 682 6002 Veh Sig Sec (12")Led(Grn Arw) Ea 2.000 104 682 6003 Veh Sig Sec (12")Led(Yel) Ea 12.000 105 682 6004 Veh Sig Sec (12")Led(Yel Arw) Ea 2.000 106 682 6005 Veh Sig Sec (12")Led(Red) Ea 12.000 107 682 6006 Veh Sig Sec (12")Led(Red Arw) Ea 2.000 108 682 6060 Backplate W/Refl Brdr(3 Sec) Ea 14.000 109 684 6010 Trf Sig Cbl (Ty A)(12 Awg)(5 Condr) Lf 743.000 110 684 6012 Trf Sig Cbl (Ty A)(12 Awg)(7 Condr) Lf 337.000 111 684 6028 Trf Sig Cbl (Ty A)(14 Awg)(2 Condr) Lf 2,060.000 112 684 6031 Trf Sig Cbl (Ty A)(14 Awg)(5 Condr) Lf 537.000 113 684 6033 Trf Sig Cbl (Ty A)(14 Awg)(7 Condr) Lf 266.000 114 686 6025 Ins Trf Sig Pl Am (S)1 Arm(24') Ea 1.000 115 686 6035 Ins Trf Sig Pl Am(S)1 Arm(32')Lum Ea 1.000 116 686 6037 Ins Trf Sig Pl Am(S)1 Arm(36') Ea 1.000 117 686 6039 Ins Trf Sig Pl Am(S)1 Arm(36')Lum Ea 2.000 118 686 6059 Ins Trf Sig Pl Am(S)1 Arm(55')Lum Ea 1.000 119 688 6004 Veh Lp Detect (Sawcut) Lf 2,060.000 120 690 6131 Install Bbu System Ea 1.000 121 3076 6001 D-Gr Hma Ty-B Pg64-22 Ton 1,547.900 122 3076 6048 D-Gr Hma Ty-D Pg76-22 Ton 18,450.160 123 3084 6001 Bonding Course Gal 49,034.930 124 3085 6001 Underseal Course Gal 6,645.000 125 6001 6001 Portable Changeable Message Sign Day 184.000 126 6004 6031 Its Com Cbl (Ethernet) Lf 190.000 127 6058 6001 Bbu System (External Batt Cabinet) Ea 1.000 128 6185 6002 Tma (Stationary) Day 184.000 129 6185 6005 Tma (Mobile Operation) Day 164.000 130 6292 6001 Rvds(Presence Detection Only) Ea 6.000 131 6292 6002 Rvds(Advance Detection Only) Ea 6.000 132

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents