Similar Projects
C.R. 557 Force Main Installation
Infrastructure
Bidding
$1,515,739 est. value
Lake Alfred, FL

West Central Avenue Watermain and Streetscape Project
Infrastructure
Bidding
$6,000,000 est. value
Saint Petersburg, FL 33747

Pipeline Cleaning Services
Term Contract
Post-Bid
West Palm Beach, FL 33415

30" Reuse Water Main
New Construction
Post-Bid
Jacksonville, FL 32099

Colonial Manor Water Main Replacement Phase 3
Results
New Port Richey, FL 34655

Backflow Prevention and Plumbing Services
Term Contract
Results
Less than $200,000 est. value
Fort Lauderdale, FL

Clearflow Washwater System, Preventative Maintenance and Repair Services, Term Contract
Term Contract
Bidding
$15,500 est. value
West Palm Beach, FL 33407

Testing, Maintenance and Certification of Backflow Preventers
Post-Bid
Miami, FL 33010

Water Main Improvements Design-Build
Term Contract
Results
Less than $50,000,000 est. value
Tampa, FL

Fort King Water Main Extension
Infrastructure
Bidding
$1,900,000 est. value
Zephyrhills, FL 33544

Construction Services For Epperson North District Improvements Pasco County
Post-Bid
Wesley Chapel, FL

Potable Water Construction
Results
Pinecrest, FL 33156

Leak Detection Services
Infrastructure
Bidding
Miramar, FL

City Of Lynn Haven Push Button Maintenance, Repair and Minor Construction Contract
Post-Bid
Lynn Haven, FL 32444

Waterline Backflow Preventer
Results
Port Saint Lucie, FL 34986

Last Updated 11/03/2021 10:16 AM
Project Title

Advanced Water Meter System

Physical Address View project details and contacts
City, State (County) Sanford, FL   (Seminole County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide and install all proposed components of a fully functioning Advanced Metering Infrastructure (AMI) system and replacement water meters. This includes all hardware and software required to operate and maintain the AMI system. The project must include a training plan for the city that begins as soon as the AMI system is functional. Vendor must fully staff the project with experienced project management, installation, IT, and field auditing staff for the duration of the project.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents