Similar Projects
Cherokee Trail Phase 2B from Cherry Hill Park through Cherokee Park
Conception
$3,000,000 est. value
Cedar Rapids, IA 52405

Lindale Trail Phase I from Council Street to E/o C Avenue North East
Conception
$2,600,000 est. value
Cedar Rapids, IA 52407

HMA Resurfacing
Infrastructure
Bidding
IA

Storm Water Discharge
Infrastructure
Bidding
Dubuque, IA

Easton Valley High School Parking Lot
Infrastructure
Post-Bid
Preston, IA 52069

PCC Pavement Patching
Infrastructure
Post-Bid
IA

Edgewood Road NW from Ellis Road to Cedar River Bridge Pavement Rehabilitation
Results
$1,380,000 est. value
Cedar Rapids, IA 52407

2021 PCC Street Patching Program
Infrastructure
Results
$446,625 est. value
Ankeny, IA

Phase 4 - Tower Terrace Road from C Avenue to W/o Barnsley Lane
Conception
$6,400,000 est. value
Cedar Rapids, IA 52407

2022 Detention Tank Rehabilitation
Infrastructure
Bidding
$120,800 est. value
Breda, IA

Cedar Valley Nature Trail Rehabilitation
Infrastructure
Post-Bid
$180,000 est. value
Ely, IA

2021 HMA Residential Paving Program Contract 2
Infrastructure
Results
$800,000 est. value
Des Moines, IA

Mount Vernon Road South East 14th to 20th
Conception
$5,400,000 est. value
Cedar Rapids, IA 52407

Des Moines Levee Alterations - Phase C
Infrastructure
Bidding
$14,200,000 est. value
Des Moines, IA 50982

BCRC Detention & Support Parking Site Prep
Build-Out, Infrastructure
Post-Bid
Johnston, IA

Last Updated 02/08/2022 11:54 AM
Project Title

Industrial Street Improvements

Physical Address View project details and contacts
City, State (County) Garnavillo, IA 52049   (Clayton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $294,015
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The extent of the work consists of the reconstruction of the asphalt travel way, curb and gutter spot repairs, installation of storm sewer intakes, subdrain and geogrid along Industrial Road.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents