Similar Projects
STH 87 - CTH Z Construction / Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$500,000 CJ est. value
Luck, WI 54853

STH 87 - CTH Z Construction / Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$500,000 CJ est. value
Luck, WI 54853

Baldwin - Cumberland, St. Croix / Polk Co
Infrastructure
Bidding
$5,000,000 CJ est. value
Clayton, WI 54004

Baldwin - Cumberland, St. Croix / Polk Co
Infrastructure
Bidding
$5,000,000 CJ est. value
Clayton, WI 54004

Blacktop
Infrastructure
Post-Bid
Clear Lake, WI 54005

Paving of 75th Street
Infrastructure
Post-Bid
$700,000 est. value
Amery, WI 54001

Star Prairie - Osceola, Scl to Cth Y
Results
Osceola, Star Prairie, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Construction of Public Works Storage Facility
New Construction, Infrastructure
Bidding
$374,000 CJ est. value
Amery, WI 54001

2022 Luck Street Construction - Pulverizing and Paving
Infrastructure
Post-Bid
$200,000 est. value
Luck, WI 54853

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Road Work
Infrastructure
Post-Bid
$180,000 est. value
Balsam Lake, WI

Milltown Avenue Reconstruction
Results
Milltown, WI

Last Updated 08/30/2022 10:31 AM
Project Title

Municipal Parking Lot

Physical Address View project details and contacts
City, State (County) Balsam Lake, WI 54810   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Online Bidding: Available The work for which bids are asked includes the following: Construction of a 6,000 SF municipal parking lot. Work includes but may not be limited to grading and excavating, removal and replacement of concrete sidewalk, removal and replacement of concrete curb and gutter, asphalt paving, asphalt striping, and turf restoration. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. 11 East Marshall Street, Suite 201, Rice Lake, WI 54868The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. OWNER reserves the right to waive any informalities or to reject any or all bids.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents