Similar Projects
Kennett 2021 Street
Infrastructure, Alteration
Post-Bid
Kennett, MO

Z--Mo-Big Muddy-Trail Resurfacing
Renovation, Alteration
Post-Bid
$100,000 to $225,000 est. value

Playground Safety Tiles
Term Contract
Results

Resurface
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
MO

Malden R-1 High School Community Track
New Construction
Post-Bid
Malden, MO

ADA Improvements
Infrastructure
Results
$50,000 to $100,000 est. value

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Job Order Contract for Concrete Pavement Repair
Infrastructure
Results
$250,000 to $500,000 est. value

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Asphalt Pavement Repairs at Various Locations on I-55, I-57, and I-155 in the SE District
Infrastructure
Results
$100,000 to $250,000 est. value

2022 Concrete Street Intersection Replacement
Infrastructure
Post-Bid
Kennett, MO

Intersection Improvement at Various Locations in the SE District
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Job Order Contract for Concrete Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Wastewater System Improvements - Contract 2
Infrastructure
Results
$700,000 CJ est. value
Campbell, MO 63933

2022 Asphalt Street Overlays and Paving
Infrastructure
Post-Bid
Kennett, MO

Last Updated 12/12/2022 11:34 AM
Project Title

RFP D/B - Frisco Park Improvements

Physical Address View project details and contacts
City, State (County) Malden, MO 63863   (Dunklin County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Request for Proposals (RFPs), Construction start expected February 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contract 1 - Splash Pad Design Build Contract 2 - Walking Trail The basis of bids is a general description of the work and materials which shall be included in the bid items listed on the bid proposal. Bid item prices shall generally reflect the scope of work described below. It shall be understood by the bidder that the total bid price listed on the bid proposal shall represent total compensation for the entire project based on the estimated quantities given. Due to the complex nature of this project, some overlap of work items is inevitable and some minor items may not be included below. It is the contractors responsibility to be sure that all work items are included in his/her bid prices. Payment after the award of the contract will be based on the number of units completed for unit price items or on the percentage of each lump sum item for the work that has been completed or as outlined I the specifications. Payment will not be made for items that have not been complete.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents