Similar Projects
St Paul's Church Storage Building / Evansville
New Construction, Infrastructure - 1,500 SF
Design
$160,000 CJ est. value
Evansville, IN 47720

Pavement and Bridge Replacement
Infrastructure
Bidding
$5,828,758 CJ est. value
Evansville, IN 47720

Training Facility Multi-Purpose Building
New Construction, Infrastructure
Bidding
$275,450 CJ est. value
Evansville, IN 47720

Evansville Water and Sewer Utility SMD Street Maintenance Department Relocation
Demolition, New Construction, Infrastructure - 74,400 SF
Sub-Bidding
$500,000 CJ est. value
Evansville, IN 47708

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Preventative Maintenance for and Fire Sprinkler and Standpipe System and Fire Hydrants
Infrastructure
Post-Bid
Evansville, IN 47714

Fendrich Neighborhood Watermain Replacement
Results
Less than $1,970,000 est. value
Evansville, IN 47711

Abandoned Coal Mine Restoration
Results
$150,000 est. value

Ohio River Crossing Projects - Kentucky Transportation Cabinet
Infrastructure
Pending Verification
$1,212,000,000 CJ est. value
Evansville, IN 47714

Menards Drive Multi-Tenant Building
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Evansville, IN 47715

Green River Road Trail Phase II Lenape Lane to High Tower Drive
Infrastructure
Bidding
$2,000,000 CJ est. value
Evansville, IN 47715

Hogue Road Water Main Improvements
Results
Less than $2,460,200 est. value
Evansville, IN 47712

Bruster's Ice Cream
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Evansville, IN 47715

Tupman Road Water Main Replacement
Infrastructure
Bidding
$554,700 CJ est. value
Evansville, IN 47720

Red Bank Road Water Main Replacement
Infrastructure
Results
$6,590,000 est. value
Evansville, IN 47731

Last Updated 09/09/2022 03:04 PM
Project Title

Lloyd SSRMP - Manhole Rehabilitation - Phase I

Physical Address View project details and contacts
City, State (County) Evansville, IN 47708   (Vanderburgh County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,033,375 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of September 9, 2022, project was awarded toCuly Contracting, LLC awarded amount is $1,033,375.20 ** The above-referenced project description includes items that are part of the rehabilitation of two-hundred and twenty-nine (229) manholes in the E-9 Sanitary Sewer Basin, including the lining of approximately one-thousand five-hundred and seventy-four (1,574) vertical feet (VFT) of sanitary sewer manholes, the replacement of approximately two-hundred and two (202) manhole frames and covers, three (3) chimney/riser sections, eight (8) cone sections, nine (9) internal drops, sixty-eight (68) construct benchwalls/rework channels, associated bypass pumping, and an undistributed quantity of adjustment rings for potential frame/cover grade adjustments. The project shall include all necessary work associated with the lining of sanitary sewer manholes, including but not limited to all materials, labor, equipment, traffic control, bypass pumping and/or diversion of sewage flows, cleaning equipment, product installation, and quality control." Work shall also include all supervision, equipment, traffic control, granular backfill, pavement restoration (milling included), flushing, disinfecting, testing and all appurtenances necessary to complete the work shown in the Drawings and Specifications. All work must be ready for satisfactory and continuous operation, in accordance with the Drawings and Specifications. The Evansville Water and Sewer Utility further reserves the right to waive informalities, and to award the contract to the lowest and most responsible bidder (or bidders), all to the advantage of the Evansville Water and Sewer Utility, or to reject all Proposals The rehabilitation of two-hundred and twenty-nine (229) manholes in the E-9 Sanitary Sewer Basin, including the lining of approximately one-thousand five-hundred and seventy-four (1,574) vertical feet (VFT) of sanitary sewer manholes, the replacement of approximately twohundred and two (202) manhole frames and covers, three (3) chimney/riser sections, eight (8) cone sections, nine (9) internal drops, sixty-eight (68) construct benchwalls/rework channels, associated bypass pumping, and an undistributed quantity of adjustment rings for potential frame/cover grade adjustments. The project shall include all necessary work associated with the lining of sanitary sewer manholes, including but not limited to all materials, labor, equipment, traffic control, bypass pumping and/or diversion of sewage flows, cleaning equipment, product installation, and quality control. All work must be ready for satisfactory and continuous operation, in accordance with the Drawings and Specifications

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents