Similar Projects
Java Drive Road Diet and Bike Lanes
Infrastructure
Bidding
$423,000 est. value
Sunnyvale, CA

2022 ADA Curb Ramps Project
Infrastructure
Bidding
$330,000 est. value
Santa Clara, CA

De Anza Park Pathway Renovation
Infrastructure
Post-Bid
$546,000 est. value
Sunnyvale, CA 94087

Reconstruction of Curbs Gutters and Sidewalks
Infrastructure
Post-Bid
$1,150,000 est. value
Cupertino, CA

Removal and Replacement of Concrete within the Public Right-Of-Way
Infrastructure
Results
San Jose, CA

The Richey Center Sidewalk Repairs
Infrastructure
Results
San Jose, CA 95110

West Valley College - Vasona Creek Trail Project
Infrastructure
Bidding
$1,300,000 est. value
Saratoga, CA 95070

2022 Parking Lot Seal Coat
Infrastructure
Post-Bid
$68,000 est. value
Morgan Hill, CA 95037

Pedestrian Improvements on Various Locations 2021
Infrastructure
Results
$635,307 est. value
Sunnyvale, CA

Pedestrian and Bicycle Safety Improvements at the Intersection of Fremont Avenue and Manet Drive/Bobwhite Avenue
Infrastructure
Bidding
$398,808 est. value
Sunnyvale, CA 94087

Addison Avenue Safe Route to School and Green Street Improvements
Alteration
Post-Bid
Palo Alto, CA

Transit Boarding Islands
Infrastructure
Results
$1,210,000 est. value
San Jose, CA 95154

Lawrence Station Area Sidewalks and Bicycle Facilities
Infrastructure
Bidding
$301,422 est. value
Sunnyvale, CA 94086

Curb, Gutter, and Sidewalk Maintenance
Alteration
Post-Bid
Los Gatos, CA

Public Right of Way ADA Improvements - Package One
Infrastructure
Results
Santa Clara, CA

Last Updated 05/13/2022 07:38 AM
Project Title

Santa Clara School Access Improvements

Physical Address View project details and contacts
City, State (County) Santa Clara, CA   (Santa Clara County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work is comprised of the following construction activities curb, gutter, sidewalk, curb ramps, bulb-outs, asphalt conforms, storm drain improvements, utility adjustments, signing, striping, signal modification, and pedestrian signal upgrades

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents