Similar Projects
New Bus Garage
New Construction
Conception
$177,000,000 to $234,000,000 est. value
Pittsburgh, PA

New Downtown Transit Center
New Construction
Conception
$60,000,000 to $118,000,000 est. value
Pittsburgh, PA

Junkin House Relocation
New Construction, Renovation - 800 SF
Design
Less than $500,000 CJ est. value
Mechanicsburg, PA 17050

Cargo 4 Building Intermodal Freight Transfer Facilities Development
New Construction
Design
Pittsburgh, PA

SCI Benner - Bus/Maintenance Facility Upgrades
Renovation
Post-Bid
$2,800,000 est. value
Bellefonte, Harrisburg, PA 16823

SCI Benner - Bus/Maintenance Facility Upgrades
Renovation
Post-Bid
$2,800,000 est. value
Bellefonte, Harrisburg, PA 16823

Shawmont Station Restoration - General
Results
Philadelphia, PA

Bus Shelter Installation
Renovation
Results
Lancaster, Reading, PA

Transportation Maintenance Building
Renovation
Construction
Lititz, PA 17543

ATA Dubois Operations Facility - New Build
New Construction - 25,000 SF
Construction
$16,508,000 est. value
DuBois, PA 15801

The Atlas 1923
Renovation - 40,000 SF
Pending Verification
Harrisburg, PA 17110

Hazelwood Green Bus Shelters - Shelters for Migrating Species
New Construction
Conception
$300,000 est. value
Pittsburgh, PA 15207

Installation/Construction Of Fish Habitat Enhancement Structures
New Construction
Post-Bid
Shippensburg, PA 17257

Bus Stop Installation Project
New Construction
Results
PA

Johnstown Incline Rehabilitation Project - General Construction
Renovation
Post-Bid
Johnstown, PA 15905

Last Updated 05/03/2022 12:00 AM
Project Title

Hemlock Farms Main Entry Sign

Physical Address View project details and contacts
City, State (County) Lords Valley, PA 18428   (Pike County)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method Competitive Bids.
Project Status All Bids Received, Selection Underway
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of replacing an existing double-sided community entrance sign and landscaping with two new single-sided signs and a new landscape berm. The work is separated into two base bids. The "Base Sign Bid" consists of, but is not limited to removing existing sign, sign lighting, and any plantings within the designated work area; providing and installing all elements of the sign including masonry wall and footings, cast stone cap, composite wood ledge, aluminum sign panel, individual letters, and community logo, all electrical components and work for the sign lighting, and earthwork required to backfill and stabilize the sign wall. The "Base Landscape Bid" consists of, but is not limited to removing and reutilizing the existing boulders, providing and installing plantings and boulders, earthwork, topsoil, and grading to establish disturbed areas in lawn. Bidding will be done through PennBid.

Details

Misc. Structures, New Construction.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 31 - Earthwork.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents