Similar Projects
Seal Coating, Wedging and Patching of Town Roads and Reconstruction of Sharon Street in St John
Infrastructure
Bidding
$200,000 est. value
Hilbert, WI 54129

2021 Road Paving
Post-Bid
Chilton, WI

Twin Valley Road Improvements
Infrastructure
Post-Bid

Chilton - Valders, STH 67 - Roosevelt Street
Results
Chilton, Valders, WI 53014

Asphaltic Concrete Pavement
Results
Chilton, WI

Pond View Estates Road
Infrastructure
Post-Bid
Sherwood, WI 54169

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2022 Crack Seal Program
Infrastructure
Post-Bid
Hilbert, WI 54129

Harrison Ryford Street and Highland Court Culvert and Roadway Construction
Results
WI 54952

2022 Irish Road / Geiser Way / T.I.D. 6 Construction
Infrastructure
Post-Bid
$1,375,000 est. value
Chilton, WI

Saint Charles Road Improvements, Paradise Road to CTH G
Results
Less than $510,000 est. value
Brothertown, WI

Saint Charles Road, TRID Improvements
Results
Less than $400,000 est. value
Brothertown, WI

2021 Street Paving Program
Results
WI 54915

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

2021 Pavement Improvements
Results
$64,000 est. value
New Holstein, WI

Last Updated 04/17/2022 11:54 PM
Project Title

2022 Asphalt Street Resurfacing Program

Physical Address View project details and contacts
City, State (County) Hilbert, WI 54129   (Calumet County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of pulverizing, fine grading and installing new HMA pavement on various roadways located in the Village of Harrison. There is approximately 15,300 linear feet of existing asphalt streets to be pulverized and fine graded and placement of 11,000 tons of new HMA pavement. Additional work includes 7,800 linear feet of re-ditching, removal and resetting culverts, miscellaneous sub-base repair, 1,200 linear feet of mini-storm sewer construction, 2,300 linear feet of replacement concrete curb and gutter and 15,000 square yards of lawn restoration.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents