Similar Projects
Last Updated | 11/28/2022 12:07 PM |
Project Title | Video Management System Upgrade - Phase 1 |
Physical Address | View project details and contacts |
City, State (County) | Jackson, MI 49201 (Jackson County) |
Category(s) | Government/Public |
Sub-Category(s) | Prison/Jail |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $3,013,620 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of November 28 2022, this project has not yet been awarded. A timeline for award has not yet been established.** This is an upgrade of the components of the video security system. o Work shall include but not be limited to: o Install cabling, security cameras, network switches and servers/storage to support the new and existing cameras plus the growth factor. See specs and drawings. o Replace existing camera monitoring PC's and provide new PC's as noted on the drawings and specifications. o Electrical system upgrades for UPS and power to devices. o For new cameras provide costs to include license software maintenance thru July 1, 2024. Genetec base camera licenses shall be transferred from the owners' pool of licenses. o For new monitoring PC's provide Genetec licenses o Fully load the latest Genetec software on the servers and PC's and upgrade all new and existing camera software to the latest firmware that is compatible with the Genetec software. o Provide full documentation and as-builts of network connectivity and camera locations and camera numbers on redlined PDF documents. See specifications for full closeout documentation required. o Install New UPS and distribution system to back up all camera related components in the Administration Building o Replace all existing UPS units in other buildings o Add surge protection devices on exterior mounted cameras o Add conduit and wire between Sally Port and Maintenance Building for relocation of microwave controls o Add conduit and fiber between cabinet near the Sally Port and the Maintenance Building 5% Bid Security: ACCEPTING QUESTIONS UNTIL: October 10,2022 at 2:00 PM ET. All questions to be submitted to bids@commtechdesign.com FILE NUMBER: 472/21301.JBB Project: 21316.07 |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |