Similar Projects
Alger Correctional Facility ADA Egress Ramps
Infrastructure
Bidding
$484,218 CJ est. value
Munising, MI 49862

MDOC Lakeland Correctional Facility - HVAC Systems Upgrade
Renovation
Bidding
$1,089,000 CJ est. value
Coldwater, MI 49036

RFP Design - Michigan Reformatory - Building Demolitions
Demolition, Infrastructure
Post-Bid
$190,000 CJ est. value
Ionia, MI 48846

McCoy Gun Range Improvements
Demolition, Renovation, Infrastructure
Bidding
Jackson, MI 49201

Food Service Flooring and Shower Upgrades - Parnall Correctional Facility
Renovation
Post-Bid
$370,000 CJ est. value
Jackson, MI 49201

RFP D/B - Charles Egeler Reception and Guidance Center - Med Line Remodel
Build-out, Renovation
Post-Bid
$183,000 CJ est. value
Jackson, MI 49201

SMT Parnall Various Housing Units Water Infrastructure Repairs and SMT Parnall Food Service Flooring and Shower Upgrades
Renovation
Bidding
$60,000 CJ est. value
Jackson, MI 49201

Charles E. Egeler Reception and Guidance Center Various Safety Improvements
Renovation
Bidding
$112,000 CJ est. value
Jackson, MI 49201

Kent County Correctional - Cell Door Replacement B3 D2 D3
Renovation, Alteration
Results
Grand Rapids, MI

Thumb Correctional Facility - PPD System Replacement Phase 1
Renovation
Bidding
$1,240,000 CJ est. value
Lapeer, MI 48446

RFP Design - Women's Huron Valley Correctional Facility (WHVCF) Power Plant Building - Phase 1 Boiler Replacements
Renovation
Post-Bid
$215,000 CJ est. value
Ypsilanti, MI 48197

Last Updated 11/28/2022 12:07 PM
Project Title

Video Management System Upgrade - Phase 1

Physical Address View project details and contacts
City, State (County) Jackson, MI 49201   (Jackson County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $3,013,620 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of November 28 2022, this project has not yet been awarded. A timeline for award has not yet been established.** This is an upgrade of the components of the video security system. o Work shall include but not be limited to: o Install cabling, security cameras, network switches and servers/storage to support the new and existing cameras plus the growth factor. See specs and drawings. o Replace existing camera monitoring PC's and provide new PC's as noted on the drawings and specifications. o Electrical system upgrades for UPS and power to devices. o For new cameras provide costs to include license software maintenance thru July 1, 2024. Genetec base camera licenses shall be transferred from the owners' pool of licenses. o For new monitoring PC's provide Genetec licenses o Fully load the latest Genetec software on the servers and PC's and upgrade all new and existing camera software to the latest firmware that is compatible with the Genetec software. o Provide full documentation and as-builts of network connectivity and camera locations and camera numbers on redlined PDF documents. See specifications for full closeout documentation required. o Install New UPS and distribution system to back up all camera related components in the Administration Building o Replace all existing UPS units in other buildings o Add surge protection devices on exterior mounted cameras o Add conduit and wire between Sally Port and Maintenance Building for relocation of microwave controls o Add conduit and fiber between cabinet near the Sally Port and the Maintenance Building 5% Bid Security: ACCEPTING QUESTIONS UNTIL: October 10,2022 at 2:00 PM ET. All questions to be submitted to bids@commtechdesign.com FILE NUMBER: 472/21301.JBB Project: 21316.07

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents