Similar Projects
Action for Eastern Montana Glasgow Head Start Facility
Infrastructure
Results
$380,573 CJ est. value
Glasgow, KY 42141

Action for Eastern Montana Glasgow Head Start Facility
Infrastructure
Results
$380,573 CJ est. value
Glasgow, KY 42141

Railroad Alley Sewer Separation
Infrastructure
Post-Bid
$600,000 CJ est. value
Glasgow, MT 59230

Railroad Alley Sewer Separation
Infrastructure
Post-Bid
$600,000 CJ est. value
Glasgow, MT 59230

Demolition of the Frazer Community Hall
Demolition, Infrastructure
Post-Bid
$60,000 CJ est. value
Frazer, MT 59225

Construction of Frazer Community Hall Foundation Project
Infrastructure
Post-Bid
$250,000 CJ est. value
Frazer, MT 59225

Construction of Frazer Community Hall Foundation Project
Infrastructure
Post-Bid
$250,000 CJ est. value
Frazer, MT 59225

Fort Peck Toe Drain Outfall Repair and Monitoring System
Infrastructure
Results
$1,624,847 CJ est. value
Fort Peck, MT 59223

Fort Peck Toe Drain Outfall Repair and Monitoring System
Infrastructure
Results
$1,624,847 CJ est. value
Fort Peck, MT 59223

Glasgow Pool - Rebid
New Construction, Infrastructure, Renovation - 2,856 SF
Results
$1,677,368 CJ est. value
Glasgow, MT 59230

Opheim Branchlines Project - Phase 1A
Infrastructure
Results
$5,375,977 CJ est. value
Opheim, MT 59250

Opheim Branchlines Project - Phase 1A
Infrastructure
Results
$5,375,977 CJ est. value
Opheim, MT 59250

Frazer Community Building
Renovation, Infrastructure
Post-Bid
$414,000 CJ est. value
Frazer, MT 59225

Frazer Community Building
Renovation, Infrastructure
Post-Bid
$414,000 CJ est. value
Frazer, MT 59225

Fort Peck Power House 1 Draft Tube Stoplog Replacement
Infrastructure
Bidding
$1,000,000 CJ est. value
Fort Peck, MT 59248

Last Updated 06/09/2023 05:07 PM
Project Title

Public Water System Improvements

Physical Address View project details and contacts
City, State (County) Saint Marie, MT 59231   (Valley County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $3,592,250 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Public Water System Improvements North Valley County Water and Sewer District Project #2-19111 TO 1 The project consists of four schedules. Schedule One consists of replacing 2,200 linear feet of 8-inch asbestos cement (AC) water main with new 8-inch polyvinyl chloride (PVC) water main, replacing and installing new valves, fire hydrants, and water services up to and including curb stops. Schedule Two consists of replacing 1,740 linear feet of 10-inch asbestos cement (AC) water main with new 10-inch polyvinyl chloride (PVC) water main, replacing and installing new valves, and water services up to and including curb stops. Schedule Three consists of replacing 1,940 linear feet of 10-inch and 6-inch asbestos cement (AC) water main with new 8-inch polyvinyl chloride (PVC) water main, replacing and installing new valves, fire hydrants, and water services up to and including curb stops. Schedule Four consists of replacing 1,790 linear feet of 6-inch asbestos cement (AC) water main with 8-inch polyvinyl chloride (PVC) water main, replacing and installing new valves, fire hydrants, and water services up to and including curb stops. Question Deadline 06/02/2023 at 5:00 PM MT All questions about the meaning or intent of the Contract Documents are to be submitted in writing to and must be received by Great West Engineering, mail at: 6780 Trade Center Ave, Billings, MT 59101, or email at: glukasik@greatwesteng.com.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents