Similar Projects
Design-Bid-Build: Potable Water Distribution System
Infrastructure
Design
$10,000,000 to $25,000,000 est. value
Indian Head, MD 20640

Cockeysville Force Main and Texas Pumping Station Influent Sewer Rehabilitation
Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value
Cockeysville, MD 21030

Pumps Repair Boiler Room
Infrastructure
Bidding
Less than $50,000 est. value
Jessup, MD 02794

Granular Activated Carbon Filtration System Installation and Maintenance
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value

Granular Activated Carbon Filtration System Installation and Maintenance
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value

Deal Island Road Watermain Loop Project
Results
Princess Anne, MD 21853

Interior/Exterior Repairs, Hill Grove Pump House, Rocks State Park, Harford County
Results
Less than $50,000 est. value
Jarrettsville, MD 21084

Replacement Pump and Motor
Infrastructure
Bidding
Salisbury, MD 21801

Galvanized Pipe Replacement (RGH)
Post-Bid
Laurel, MD 20707

Pipe Reinsulation, Drywall Repairs, and Replacing Ceiling Tiles
Results
Less than $100,000 est. value
Catonsville, MD 21228

Water Meter Replacement
Infrastructure
Bidding
$400,000 est. value
Centreville, MD

Water Line Installation Fraternity Row
Infrastructure
Post-Bid
$100,000 to $500,000 est. value
College Park, MD 20740

Dual Check Overhaul Services
Term Contract
Results
La Plata, MD

Demolition Septic Tank and Install New Grinder Pump
Demolition, Infrastructure
Bidding
$50,000 est. value
White Marsh, MD 21162

Mountainview Road Extension and SWM Project
Alteration
Post-Bid
Boonsboro, MD 21713

Last Updated 04/20/2022 06:18 AM
Project Title

Bowling Green Meter Replacement and Booster Pump Project

Physical Address View project details and contacts
City, State (County) MD   (Allegany County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Bowling Green Meter Replacement & Booster Pump Project, consisting of the replacement of existing meters and installation of a new booster pump to complete the project in Allegany County.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents