Similar Projects
2022 CIPP Rehabilitation Project
Infrastructure
Bidding
Bluffdale, UT

SR-186; 2100 E. to Stringham Ave
Infrastructure
Bidding
$1,500,000 to $3,000,000 est. value
UT

SLC Airport PCC Pavement Joint Seal Program - Deicing Pad Taxiway
Post-Bid
Salt Lake City, UT

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

300 East (11400 South to 11800 South) Reconstruction Project
Results
Draper, UT 84020

2021 High Density Mineral Bond
Results
South Jordan, UT 84095

Paxton East Parking Lot
New Construction
Construction
$50,000 est. value
Salt Lake City, UT 84101

SR-266; I-15 To 700 E
Infrastructure
Bidding
$1,500,000 to $3,000,000 est. value
UT

Deer Ridge Drive Reconstruction
Alteration
Post-Bid
$980,000 est. value
Draper, UT

1500 South Reconstruction From Redwood Road To 2700 West
Results
Salt Lake City, UT

5400 South and 1900 West Intersection
Infrastructure
Bidding
Less than $500,000 est. value
UT

City-Wide Roadway Improvement Project
Infrastructure
Post-Bid
Cottonwood Heights, UT

On-Call Transit Infrastructure Construction, Maintenance and Repair
Term Contract
Results
Less than $5,000,000 est. value
Salt Lake City, UT

2022 South Salt Lake City Slurry Seal and Mastic Seal Projects
Infrastructure
Bidding
South Salt Lake, UT

Y--Price Canyon Recreation Site Road Improvements
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Reported 03/31/2022 12:00 AM
Project Title

2022 Roadway Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Herriman, UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 03/14/22
Owner View project details and contacts
Architect View project details and contacts
Description

2022 Roadway Rehabilitation Project. The project includes approximately 58,000 sq. ft. of full depth reclamation (pulverizing and mixing existing asphalt & road base to produce a bituminous-aggregate base course mix) & 3” HMA Overlay. The project also includes approximately 70,000 sq ft of edge milling, 143,000 sq ft 2” HMA overlay, and various areas of asphalt patching and repair.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents