Similar Projects
Absecon Inlet to Great Egg Harbor Inlet, Absecon Island, Atlantic County, NJ.
Post-Bid
$25,000,000 to $100,000,000 est. value
Absecon, NJ

Fire House No. 1 Flood Protection Project
Post-Bid
Margate City, NJ 08402

The Atlantic City Expressway 2019 Culvert Rehabilitation Project
Results
Hammonton, NJ 08037

Magnolia Avenue Drainage Improvements
Results
Galloway, NJ

Atlantic City Expressway 2020 Culvert Rehabilitation
Post-Bid
Hammonton, NJ 08037

Amherst Avenue Bulkhead Replacement Project
Results
Margate City, NJ

Winchester Avenue Drainage Improvements
Results
Ventnor City, NJ

Maintenance Timber/Underwater/Drainage Structural Repair
Results
$5,000,001 to $10,000,000 est. value

Drainage Improvements, Marshall Avenue and Oxford Avenue
Results
$227,528 est. value
Ventnor City, NJ 08406

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Replacement Bulkhead and Stormwater Improvement
Results
Atlantic City, NJ 08401

Beachfill Nourishment
Results
Egg Harbor City, NJ

Drainage and Roadway Improvements, Beach Avenue 8th to 10th Streets South
Results
Brigantine, NJ 08203

Drainage Restoration Contract, Statewide -2019
Results
$5,000,001 to $10,000,000 est. value

FY 2019 CDBG Beach Bulkhead Access
Results
Margate City, NJ 08402

Reported 11/06/2020 12:00 AM
Project Title

Wabash Avenue Drainage Improvements

Physical Address View project details and contacts
City, State (County) Linwood, NJ 08221   (Atlantic County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the installation of 15 stormwater inlets and approximately 728 linear feet of stormwater pipe, the construc-tion of 2 stormwater sediment trap structures, the excavation of 390 cubic yards of earth and the installation of 35 cubic yards of K-5 sand for a stormwater basin, and the associated roadway and concrete restoration in the City of Linwood. The work is located within the City of Linwood on Wabash Avenue between Patcong Avenue and Maple Avenue and on Hamilton Avenue.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents