Similar Projects
Winter Park High School Walk-In Cooler Installation
Alteration
Bidding
$215,000 est. value
Winter Park, FL 32792

Main Library Chiller Replacement
Alteration
Bidding
$200,000 est. value
Fort Lauderdale, FL 33301

Ground Transportation Facility GMP 8S.1
Post-Bid
Orlando, FL 32827

Repairs to Degasifer Unit
Post-Bid
Miramar, FL

Resins for Per Fluorinated Treatment System
Term Contract
Results
Stuart, FL 34994

Stormwater Pond Aeration Maintenance
Results
Fort Myers, FL 33913

Florida Southwestern State College Campus, Lee, East Yard Chiller Upgrades
Post-Bid
Fort Myers, FL 33919

Chartwells Kitchen Facility Cooler/ Freezer System Replacement
Results
Less than $750,000 est. value
Pembroke Pines, FL 33025

Pbc Convention Center - Coolers and Freezer Replacement
Post-Bid
West Palm Beach, FL 33411

Fountain and Pond Management Services
Results
Less than $122,303 est. value
Jacksonville, FL

Commercial Refrigeration Repair Services
Term Contract
Post-Bid
$250,000 est. value
Bradenton, FL

Dyal Groundwater Filters #2 IMS Cap and Media Replacement
Results
Less than $233,928 est. value
Christmas, FL 32709

PHCD Boiler Inspections Preventive Maintenance and Repair Services Parts
Post-Bid
$80,000 est. value
Miami, FL 33138

Mechanical, Electrical and Plumbing Services Orangewood Elementary School AHU Renovation
Results
$3,500,000 to $4,500,000 est. value
Fort Myers, FL 33901

Maintenance of Town Fountains
Post-Bid
Palm Beach, FL

Reported 05/25/2022 12:00 AM
Project Title

RFP D/B - Replace Lake Baldwin DOM Hot Water Heater

Physical Address View project details and contacts
City, State (County) Orlando, FL 32803   (Orange County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected September 2022, Construction Completion Expected March 2023
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will assess, design, and build project that will replace the existing water heater system at the Lake Baldwin Domiciliary Bldg. 520. The existing system is an outdated unit and needs to be upgraded. Contractor shall ensure all aspects of the new water heater meets all applicable codes and regulations. Work includes general construction, alterations required for civil, structural, plumbing, mechanical, electrical work and certain other items as described in the specifications and drawings.

Details

Division 22 - Plumbing, Electric Domestic Water Heaters.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents