Similar Projects
Murphy USA #7200 / Eastman
New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Eastman, GA 31023

SR 165 From SR 132 to S of SR 30
Infrastructure
Design
$2,000,000 CJ est. value
Eastman, GA 31023

SR 165 From SR 132 to S of SR 30
Infrastructure
Design
$2,000,000 CJ est. value
Eastman, GA 31023

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

Jacks / Eastman
New Construction, Infrastructure - 3,275 SF
Post-Bid
$1,000,000 CJ est. value
Eastman, GA 31023

Fiscal Year 2021 LMIG Projects
Results
Eastman, GA

Fiscal Year 2021 Dodge County T-Splost Part 1
Infrastructure
Results
GA

Water Meter Replacement
Infrastructure
Post-Bid
$300,000 CJ est. value
Eastman, GA 31023

Fiscal Year 2021 Dodge County T-Splost Part 2
Infrastructure
Results
GA

2020-2022 LMIG, Street Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Eastman, GA 31023

Dodge State Prison Drainage Improvements Phase 2
Infrastructure
Results
Chester, GA 31012

Fiscal Year 2022 LMIG Projects
Infrastructure
Results
GA

Repaving at Middle School
Infrastructure
Results
Eastman, GA 31023

Fiscal Year 2022 Dodge County T-Splost Part 2
Infrastructure
Results
Eastman, GA

Last Updated 03/09/2023 11:17 AM
Project Title

2020-2022 LMIG Street Improvements

Physical Address View project details and contacts
City, State (County) Eastman, GA 31023   (Dodge County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $220,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of +- 1.29 miles of resurfacing and leveling, including +- 1,172 tons of 9.5mm Superpave topping, +- 291 tons of 4.75 Superpave leveling, +- striping, and all appurtenances necessary for a complete job. All work on the Project must be completed within 210 consecutive calendar days of date of notice to proceed. No bid will be considered unless sealed and filed with the City of Eastman prior to the time set forth above, and accompanied by a Bidder's Bond, payable to the City of Eastman for 10 percent of the amount of the bid; to be forfeited as liquidated damages in the event that the bid be accepted and the bidder fail to enter promptly into a written contract and furnish the required Payment Bond and Performance Bond and Insurance Certificates. Bids arriving after the designated time will be returned unopened. No bids shall be withdrawn for a period of 60 days after the opening of bids. The City of Eastman, reserves the right to reject any or all bids and to overlook and/or disregard informalities or irregularities in the proposals.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents