Similar Projects
Bridge Replacements and Highway Intersection Reconstruction
New Construction, Infrastructure
Bidding
ME

Bridge Replacements and Highway Intersection Reconstruction
New Construction, Infrastructure
Bidding
Old Town, ME

Railroad Bridge Capacity
Post-Bid
Frenchville, ME 04745

Blue Hill, Falls Bridge No 5038 /Located On Route 175 Over Salt Pond Outlet
Post-Bid
Blue Hill, ME

Replace Stacyville Road Bridge
Results
$25,000 to $100,000 est. value
Patten, ME 04765

Veranda Street Bridge Replacement, CNRR Crossing Bridge Rehabilitation, and Interstate 295 Southbound Over Washington Avenue Bridge Rehabilitation
Results
Portland, ME 04101

Madawaska Bridge Construction Support Services
Post-Bid
ME

P-381 Multi-Mission Dry Dock #1, Portsmouth Naval Shipyard (PNSY), Kittery Maine
Results
$500,000,000 est. value
Kittery, ME

Bridge Improvements to the Augusta, Western Avenue Bridge Over Interstate 95
New Construction
Post-Bid
Augusta, ME

Madawaska Land Port of Entry Design Build Bridge
Results
Madawaska, ME

Installation of a Pedestrian Bridge
Post-Bid
Saco, ME

Pleasant River Bridge Replacement
Results
Less than $7,817,000 est. value
Milo, ME 04463

Waterville and Winslow, Ticonic Bridge - Region 2
New Construction, Infrastructure
Post-Bid
Waterville, ME 04901

Schoodic Bridge Replacement and Covered Bridge Wearing Surface Rehabilitation
Results
Less than $2,432,000 est. value
Cherryfield, ME 04622

Drisko Bridge Substructure Rehabilitation
Results
Jonesboro, ME

Last Updated 02/25/2022 09:14 AM
Project Title

Superstructure Replacement - Richmond Road (Route 197) Underpass Mile 93.3

Physical Address View project details and contacts
City, State (County) Litchfield, ME   (Kennebec County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of replacing the Richmond Road (Route 197) bridge superstructure over the Maine Turnpike in the Town of Litchfield, Maine. The work includes concrete deck, steel girder and bearing replacement, concrete substructure modifications and repairs, approach work and paving, guardrail, bridge rails, maintenance of traffic and all other work incidental thereto in accordance with the Plans and Specifications. The Authority has pre-purchased the new structural steel, bearings, and expansion joints. The Contractor is responsible for the installation of these items.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents