Similar Projects
Final Effluent Pump Station And Stormwater Channel Improvements
New Construction
Conception
$12,754,000 est. value
San Jose, CA 95134

Oakmead, Redwood, And Outlet Mall Lift Station Upgrades - C66501923 - City Of Petaluma
Renovation
Conception
$1,800,000 est. value
Petaluma, CA 94952

BVF Comfort Station and Water Supply
New Construction
Design
$1,000,000 to $5,000,000 est. value
Yosemite National Park, CA

Walnut Avenue Pump Station
New Construction
Design
$880,000 est. value
Simi Valley, CA 93063

Pump Station Recovery Mitigation Project
Renovation
Bidding
Long Beach, CA

Copper Cove Lift Station 6, 8, 15 and 18 Renovations and Lift Station 12 and 13 Force Main Bypass Project
Renovation
Bidding
$7,190,000 est. value
Copperopolis, CA 95228

LillyHill & L Street Water Booster Station
Renovation
Post-Bid
$1,500,000 est. value
Needles, CA 92363

Bridalveil Fall Comfort Station & Water Supply
New Construction
Post-Bid
Yosemite Lakes, CA

Plant Structural Improvements
New Construction
Results
$2,500,000 est. value
Modesto, CA 95351

Z--CA-Stone Lakes NWR-Pumps Station Replace
Renovation
Results
Elk Grove, CA 95757

Add Third Lagoon Pump and Related Infrastructure - SW-03 - City of Foster City
Renovation
Conception
$2,000,000 est. value
Foster City, CA 94404

1.3 MG Fleming Zone 8 Reservoir and Zone 8 to 9 Pump Station
Renovation
Bidding
$13,000,000 est. value
Irvine, CA

Inspect and Repair Rebuild Eight Turbine Pumps
Renovation
Post-Bid
Redding, CA

Sewage Lift Station Pump Maintenance
New Construction
Results
$330,000 est. value
Carlsbad, Huntington Beach, Laguna Beach, San Clemente, CA

P Street Lift Station Upgrade and Modification
Renovation
Bidding
$3,500,000 to $4,250,000 est. value
Live Oak, CA 95953

Reported 06/24/2022 09:17 AM
Project Title

Lift Station Improvements - 304k15 - City of Morgan Hill

Physical Address View project details and contacts
City, State (County) Morgan Hill, CA 95037   (Santa Clara County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024, Construction Completion Expected July 2028
Bids Due View project details and contacts
Estimated Value $3,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a water / sewer project in Morgan Hill, California. Conceptual plans call for the construction of a water / sewer project; and for site work for a water / sewer project. The City's fourteen (14) lift stations are periodically repaired and upgraded as part of the ongoing maintenance program. Lift Stations J & W were completed in FY20-21. During FY 21-22, the design of the rehabilitation of Lift Stations K & F's improvements were completed. The upgrades to the lift stations will improve safety and reliability and will upgrade the lift stations to the City Utilities standards. For FY 23-24, Lift Stations K & F's rehabilitation will be constructed, to include: protective well coatings, new pump assemblies, motor controls, electrical components, and site access improvements. Additionally, there is approximately 3,200' of force main piping connected to Lift Stations K & F that must be replaced, which will improve access to the force mains and replace the existing, failing pipe. This project is in included in the City of Morgan Hill FY 2022-2028 Capital Improvement Plan (CIP). As of June 23, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

14 Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents