Similar Projects
Parcel H Development
New Construction - 150,900 SF
Conception
$10,000,000 CJ est. value
Northborough, MA 01532

Office Building Complex
New Construction - 26,400 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Worcester, MA 01610

American Self Storage
Addition - 123,000 SF
Design
Southborough, MA 01772

Sources Sought - Prefabricated Warehouse
- 8,000 SF
Post-Bid
Devens, MA

Temporary Relocatable Storage Building
Post-Bid
Boston, MA

Grafton DPW Facility - General Bids
New Construction - 33,800 SF
Results
Less than $11,800,000 est. value
Grafton, MA

Construction of a Steel Maintenance Building and 2 Timber Salt Sheds at Freeport Street and Victory Road - General Bid
Results
Less than $3,523,760 est. value
Boston, MA

Fred Salvucci Company Dry Storage Building Foundation
New Construction - 2,040 SF
Construction
Billerica, MA 01821

Amazon Warehouse
New Construction - 525,000 SF
Construction
Boston, MA

727 Revere Beach Parkway
New Construction
Pending Verification
Revere, MA 02151

Happy Valley Ventures
Renovation - 10,840 SF
Pending Verification
East Boston, MA

1252-1270 Boylston Street
New Construction - 226,700 SF
Design
$1,000,000,000 est. value
Boston, MA

Erection of a Prefabricated Steel Building
Term Contract
Post-Bid
Less than $50,000 est. value
Boston, MA 02120

Construction of a Steel Maintenance Building and 2 Timber Salt Sheds at Freeport Street and Victory Road Filed Sub Bids: 100.5 Electrical Work - Sub Bid
Results
Boston, MA

Storage Units and Offices
New Construction, Demolition - 186,916 SF
Construction
Framingham, MA 01702

Last Updated 02/27/2019 02:58 AM
Project Title

Scheduled and Emergency Salt Storage Shed and Liquid Storage.

Physical Address View project details and contacts
City, State (County) (Middlesex, Suffolk, Worcester Counties)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $616,580
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description "6000.000","Hr","Base Labor Rate","100.1" "0.250","a","Selective Clearing And Thinning","102." "20.000","Ton","Disposal Of Treated Wood Products","184.1" "15.000","Ton","Disposal Of Construction And Demolition Debris","184.2" "4.000","Day","Martha's Vineyard Mobilization","748.01" "5.000","Ea","Emergency Response","748.1"
Details
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents