Similar Projects
Last Updated | 10/19/2020 09:55 AM |
Project Title | Water Reclamation Facility Clarifier Rehabilitation Phase I |
Physical Address | View project details and contacts |
City, State (County) | VA (Henrico County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work consists of demolishing the existing primary clarifier internal mechanisms and installing new primary clarifier internal mechanisms inside existing Primary Clarifiers 1, 3, and 4, which are 115-ft diameter tanks. Demolishing existing and installing new electrical controls, conduit, and lighting associated with three new primary clarifier internal mechanisms. Repairing miscellaneous concrete wall areas and performing surface preparation and installing full floor grout over top of the existing floor inside three existing 115-ft diameter primary clarifiers. Removing debris from the 66-inch splitter box influent pipe, located in the splitter box invert. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |