Similar Projects
RFQ Contractor - Replace HVAC Building 105,Haskell Indian Nations University
Alteration
Design
$1,000,000 est. value
Lawrence, KS 66046

Main Courthouse Chiller Rebuild
Renovation
Sub-Bidding
$400,000 CJ est. value
Wichita, KS 67203

Chiller Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
Leavenworth, KS 66048

Repair HVAC Sanctuary Building 510
Alteration
Post-Bid
$1,000,000 est. value
KS

Repair Exterior and Roof Building 852
Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value
KS

Missouri River Intake HVAC Improvements & Roof Replacement
Renovation
Results
$1,560,000 CJ est. value
Kansas City, KS 66104

Contractor - HVAC Modernizations
Alteration
Results
$80,000 to $120,000 est. value
Chanute, KS 66720

Building 226 HVAC Replacement - Construction, Fort Leavenworth
Renovation
Post-Bid
$5,000,000 CJ est. value
Fort Leavenworth, KS 66027

2022 HVAC Modernizations at Park Place Apartments
Alteration
Results
$400,000 est. value
Lyons, KS 67554

Annual Contract for Chiller Maintenance Services
Term Contract
Post-Bid
Overland Park, KS 66204

King Hall Make Up Air Improvements
Alteration
Results
$400,000 est. value
Emporia, KS 66801

Bus Barn HVAC Improvements
Renovation
Post-Bid
$300,000 CJ est. value
Dodge City, KS 67801

North East Office Cooling Tower Replacement
Renovation
Results
$19,800 CJ est. value
Mission, KS 66202

HVAC Municipal Services Building
Renovation
Post-Bid
$400,000 CJ est. value
Dodge City, KS 67801

Stratford Elevated Water Tower
Demolition, Renovation, Infrastructure
Results
$5,256,000 CJ est. value
Lawrence, KS 66044

Last Updated 10/18/2023 06:38 AM
Project Title

2023 CFP HVAC Modernizations At Townhouse West Apartments

Physical Address View project details and contacts
City, State (County) Iola, KS 66749   (Allen County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The budget for the project is between $265,000 and $300,000. The contractor shall furnish all tools, materials, labor, equipment and services for the replacement of fan coil units, related piping/valves, the chillers and other items indicated on the plans and specifications. All Work is to be completed free from defects in material, workmanship, and in strict accordance with the Specifications and Drawing, which are herein incorporated by reference and made a part hereof. The Iola Housing Authority will receive sealed bids until the date and time stated above for the HVAC modernization project referenced above. The work includes replacement of fan coil units, related piping, valves, replacement of the chillers, and other items as indicated on the drawings and specs. Bids are to include all necessary labor, materials and equipment. For all construction and equipment contracts over $25,000, the bidder shall be required to submit with the bid a negotiable bid guarantee not less than five percent (5%) of the amount of the bid. The bid guarantee shall be a certified check, bank draft, U.S. Government Bond at par value or a bid bond secured by a surety company. The surety company must be authorized to do business in the State where the project is located and must be acceptable to the Government. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents