Similar Projects
2023 Bond Passed - Waxahachie Independent School District
Renovation, Infrastructure
Conception
$576,000,000 CJ est. value
Waxahachie, TX 75165

Davis Road New Alignment - Design and Construction - City of Grand Prairie
Infrastructure
Conception
$9,300,000 CJ est. value
Grand Prairie, TX 76065

1215 Crossing Apartments
New Construction, Infrastructure - 229,800 SF
Design
$10,000,000 CJ est. value
Glenn Heights, TX 75154

Arbors of Willow Grove Playground and Splashpark
Infrastructure
Design
$187,515 CJ est. value
Waxahachie, TX 75165

7 Brew Coffee / Waxahachie
New Construction, Infrastructure - 541 SF
Post-Bid
$600,000 CJ est. value
Waxahachie, TX 75165

Ellis Ranch Phase 1 - Paving
Infrastructure
Post-Bid
$8,580,026 CJ est. value
Waxahachie, TX 75165

Chambers Creek Watershed Floodwater Retarding Structure Site# 7 Upgrade and Repair
Infrastructure
Results
$6,925,000 CJ est. value
Midlothian, TX 76065

Chambers Creek Watershed Floodwater Retarding Structure Site# 7 Upgrade and Repair
Infrastructure
Results
$6,925,000 CJ est. value
Midlothian, TX 76065

Buie Professional Building
New Construction, Infrastructure - 4,500 SF
Construction
$850,000 CJ est. value
Midlothian, TX 76065

Crossroads Logistics Park Building 4
New Construction, Infrastructure - 306,925 SF
Construction
$16,114,483 CJ est. value
Midlothian, TX 76065

7 Eleven - Ovilla Road / Glenn Heights
New Construction, Infrastructure - 4,088 SF
Pending Verification
$500,000 CJ est. value
Glenn Heights, TX 75154

Snap Clean Car Wash / Midlothian
New Construction, Infrastructure - 5,084 SF
Pending Verification
$1,500,000 CJ est. value
Midlothian, TX 76065

2023 Bond Passed - Maypearl Independent School District
Addition, Demolition, Infrastructure, Renovation
Conception
$35,000,000 CJ est. value
Maypearl, TX 76064

AutoZone #5757 / Ferris
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Ferris, TX 75125

Methodist Street Paving Improvements
Infrastructure
Post-Bid
$930,000 CJ est. value
Red Oak, TX 75154

Last Updated 10/02/2023 12:46 PM
Project Title

Chambers Creek Watershed Floodwater Retarding Structure Site# 9 Upgrade and Repair

Physical Address View project details and contacts
City, State (County) Waxahachie, TX 75165   (Ellis County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2022
Bids Due View project details and contacts
Estimated Value $3,696,969 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Questions will only be able to be asked until 12/08/2021 5:00 PM CDT Bid package and must be labeled as follows Marked: Bid-Solicitation, Must include: IFB No. EP-CHAM9-UG-ESF-541-21, Must include the Bid Due Date/Time: December 7, 2021 - 1:00 pm, Must [Show Name and Address of Bidder] The Ellis-Prairie Soil and Water Conservation District (EPSWCD), Waxahachie, Texas is requesting sealed bids from qualified, responsible bidders for UPGRADES to Floodwater Retarding Structure Site 9 at Chambers Creek Watershed in Ellis County, Texas. One award for all items will be made. Performance time is 353 calendar days (not including weather days). Estimated price range is between $3,000,000 and $5,000,000. Major items of work are: 16 AC Clearing and Grubbing; 6,000 LF Sediment Fence; 15 AC Vegetation Establishment; 23,100 CY Excavation; 100 CY Rock Excavation; 1,600 CY Earthfill; 2,300 CY Fine Drainfill; 20 CY Coarse Drainfill; 18,000 SY Embankment Topsoil; 54,900 SY Topsoil; 19,800 CY Lime Treated Earthfill; 950 tons Furnishing and Handling Lime; 80 CY Class 4500 Concrete; 40 CY Class 3000 Concrete; 311 LF Reinforced Concrete Pressure Pipe; 250 LF Perforated Plastic Pipe; 320 LF Solid Plastic Pipe; 40 LF 6" Ductile Iron Pipe; 250 LF Boring and Jacking; 2,200 tons Rock Riprap, R-150; 1,400 tons Rock Riprap; R-300; 700 tons Rock Riprap, Bedding; 250 LF Conduit Slip Lining; 1,956 LF Field Fence; 2,500 SY Geotextile and 1 Job/Lump Sum: Structure Removal; Pollution Control; Irrigation System; Construction Surveys; Mobilization and Demobilization; Removal of Water; Water Control Gate; Metal Work; Identification Plaques or Markers; Contractor Quality Control; Field Office; Conduit Abandonment. [AC: Acres; LF: Linear Feet; CY: Cubic Yards; SY: Square Yards] EPSWCD reserves the right to accept or reject any and all bids. A 5 percent bid guarantee is required. The successful bidder will be required to furnish performance and payment bonds. Estimate: $3,000,000 and $5,000,000

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents