Similar Projects
Last Updated | 10/02/2023 12:46 PM |
Project Title | Chambers Creek Watershed Floodwater Retarding Structure Site# 9 Upgrade and Repair |
Physical Address | View project details and contacts |
City, State (County) | Waxahachie, TX 75165 (Ellis County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected February 2022 |
Bids Due | View project details and contacts |
Estimated Value | $3,696,969 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Questions will only be able to be asked until 12/08/2021 5:00 PM CDT Bid package and must be labeled as follows Marked: Bid-Solicitation, Must include: IFB No. EP-CHAM9-UG-ESF-541-21, Must include the Bid Due Date/Time: December 7, 2021 - 1:00 pm, Must [Show Name and Address of Bidder] The Ellis-Prairie Soil and Water Conservation District (EPSWCD), Waxahachie, Texas is requesting sealed bids from qualified, responsible bidders for UPGRADES to Floodwater Retarding Structure Site 9 at Chambers Creek Watershed in Ellis County, Texas. One award for all items will be made. Performance time is 353 calendar days (not including weather days). Estimated price range is between $3,000,000 and $5,000,000. Major items of work are: 16 AC Clearing and Grubbing; 6,000 LF Sediment Fence; 15 AC Vegetation Establishment; 23,100 CY Excavation; 100 CY Rock Excavation; 1,600 CY Earthfill; 2,300 CY Fine Drainfill; 20 CY Coarse Drainfill; 18,000 SY Embankment Topsoil; 54,900 SY Topsoil; 19,800 CY Lime Treated Earthfill; 950 tons Furnishing and Handling Lime; 80 CY Class 4500 Concrete; 40 CY Class 3000 Concrete; 311 LF Reinforced Concrete Pressure Pipe; 250 LF Perforated Plastic Pipe; 320 LF Solid Plastic Pipe; 40 LF 6" Ductile Iron Pipe; 250 LF Boring and Jacking; 2,200 tons Rock Riprap, R-150; 1,400 tons Rock Riprap; R-300; 700 tons Rock Riprap, Bedding; 250 LF Conduit Slip Lining; 1,956 LF Field Fence; 2,500 SY Geotextile and 1 Job/Lump Sum: Structure Removal; Pollution Control; Irrigation System; Construction Surveys; Mobilization and Demobilization; Removal of Water; Water Control Gate; Metal Work; Identification Plaques or Markers; Contractor Quality Control; Field Office; Conduit Abandonment. [AC: Acres; LF: Linear Feet; CY: Cubic Yards; SY: Square Yards] EPSWCD reserves the right to accept or reject any and all bids. A 5 percent bid guarantee is required. The successful bidder will be required to furnish performance and payment bonds. Estimate: $3,000,000 and $5,000,000 |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |