Similar Projects
Subdivision Improvements for Anthem Phases 1C-2, 1C-3, 2, 3, and 4
Infrastructure
Bidding
TX

Woodcreek Drive Overlay
Infrastructure
Bidding
Woodcreek, TX 78676

Parten Ranch, Phase 5 Paving, Drainage, Water and Wastewater Improvements
Post-Bid
Dripping Springs, TX 78620

Sunfield Phase 3 Section 3-5C Paving Improvements
Post-Bid
Buda, TX

Southern Region Disaster Recovery Support BPA
Results

Concrete Flatwork and Paving IDIQ
Results
Less than $3,000,000 est. value
San Marcos, TX 78666

US0290 - Crack Seal
Infrastructure
Bidding
$144,153 est. value
TX

Sunfield Phase 3 Section 3-6A Paving Improvements
Post-Bid
Buda, TX

Freeway Operational Improvements
Results
Less than $23,721,561 est. value
TX

Sunfield Phase 3 Section 3-6B Paving Improvements
Post-Bid
Buda, TX

Construct Overpass
Results
Less than $6,055,809 est. value
TX

Sunfield Phase 4 Section 4-1A Paving Improvements
Post-Bid
Buda, TX

Highway Improvement
Results
Less than $3,657,186 est. value
TX

Sunfield Phase 4 Section 4-2 Paving Improvements
Post-Bid
Buda, TX

Cotton Gin Road Improvements - Phase 1
Results
San Marcos, TX 78666

Last Updated 09/02/2021 12:21 AM
Project Title

FM 621 - Widen Road - Add Lanes

Physical Address View project details and contacts
City, State (County) TX   (Hays County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,550,253
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing Row Sta 78.000 1 104 6009 Removing Conc (Riprap) Sy 194.000 2 104 6029 Removing Conc (Curb Or Curb & Gutter) Lf 329.000 3 104 6031 Removing Conc (Headwall) Cy 2.000 4 105 6030 Removing Stab Base & Asph Pav (8"-14") Sy 13,691.000 5 110 6001 Excavation (Roadway) Cy 12,958.000 6 132 6003 Embankment (Final)(Ord Comp)(Ty B) Cy 4,019.000 7 160 6003 Furnishing And Placing Topsoil (4") Sy 20,437.000 8 164 6023 Cell Fbr Mlch Seed(Perm)(Rural)(Clay) Sy 20,437.000 9 164 6041 Drill Seeding (Temp) (Warm) Sy 10,219.000 10 164 6043 Drill Seeding (Temp) (Cool) Sy 10,219.000 11 166 6002 Fertilizer Ton 1.300 12 168 6001 Vegetative Watering Mg 1,218.000 13 169 6001 Soil Retention Blankets (Cl 1) (Ty A) Sy 20,437.000 14 247 6366 Fl Bs (Cmp In Plc)(Ty A Gr 5)(Fnal Pos) Cy 5,839.000 15 260 6002 Lime (Hydrated Lime (Slurry)) Ton 462.000 16 260 6009 Lime Trt (Exst Matl)(10") Sy 21,021.000 17 310 6001 Prime Coat (Multi Option) Gal 3,992.000 18 351 6004 Flexible Pavement Structure Repair(8") Sy 600.000 19 354 6002 Plan & Text Asph Conc Pav(0" To 2") Sy 420.000 20 400 6008 Cut & Restore Asph Paving Sy 32.000 21 420 6029 Cl C Conc (Cap) Cy 14.000 22 432 6002 Riprap (Conc)(5 In) Cy 1.000 23 432 6045 Riprap (Mow Strip)(4 In) Cy 11.000 24 462 6012 Conc Box Culv (6 Ft X 5 Ft) Lf 56.000 25 464 6003 Rc Pipe (Cl Iii)(18 In) Lf 551.000 26 464 6005 Rc Pipe (Cl Iii)(24 In) Lf 41.000 27 466 6005 Headwall (Ch - Fw - 0) (Dia= 24 In) Ea 1.000 28 466 6182 Wingwall (Pw - 1) (Hw=7 Ft) Ea 2.000 29 467 6345 Set (Ty Ii) (18 In) (Cmp) (4: 1) (C) Ea 3.000 30 467 6377 Set (Ty Ii) (24 In) (Cmp) (4: 1) (C) Ea 5.000 31 496 6050 Remov Str (Driveway Culvert) Ea 611.000 32 500 6001 Mobilization Ls 1.000 33 502 6001 Barricades, Signs And Traffic Handling Mo 6.000 34 506 6001 Rock Filter Dams (Install) (Ty 1) Lf 70.000 35 506 6002 Rock Filter Dams (Install) (Ty 2) Lf 248.000 36 506 6011 Rock Filter Dams (Remove) Lf 318.000 37 506 6020 Construction Exits (Install) (Ty 1) Sy 156.000 38 506 6024 Construction Exits (Remove) Sy 156.000 39 506 6038 Temp Sedmt Cont Fence (Install) Lf 15,430.000 40 506 6039 Temp Sedmt Cont Fence (Remove) Lf 15,430.000 41 508 6001 Constructing Detours Sy 2,326.000 42 512 6009 Port Ctb (Fur & Inst)(Low Prof)(Ty 1) Lf 6,060.000 43 512 6010 Port Ctb (Fur & Inst)(Low Prof)(Ty 2) Lf 440.000 44 512 6033 Port Ctb (Move)(Low Prof)(Ty 1) Lf 7,400.000 45 512 6034 Port Ctb (Move)(Low Prof)(Ty 2) Lf 600.000 46 512 6057 Port Ctb (Remove)(Low Prof)(Ty 1) Lf 6,060.000 47 512 6058 Port Ctb (Remove)(Low Prof)(Ty 2) Lf 400.000 48 530 6004 Driveways (Conc) Sy 250.000 49 530 6005 Driveways (Acp) Sy 639.000 50 531 6002 Conc Sidewalks (5") Sy 613.000 51 531 6008 Curb Ramps (Ty 5) Ea 1.000 52 531 6010 Curb Ramps (Ty 7) Ea 3.000 53 540 6001 Mtl W-Beam Gd Fen (Tim Post) Lf 210.000 54 544 6006 Gdrail End Trt(Inst)(Wood Post)(Ty Iii) Ea 2.000 55 552 6002 Wire Fence (Ty B) Lf 770.000 56 560 6001 Mailbox Install-S (Twg-Post) Ty 1 Ea 1.000 57 644 6001 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(P) Ea 21.000 58 644 6004 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(T) Ea 7.000 59 644 6076 Remove Sm Rd Sn Sup&Am Ea 20.000 60 658 6057 Instl Om Assm (Om-3r)(Twt)Gnd Ea 26.000 61 662 6004 Wk Zn Pav Mrk Non-Remov (W)4"(Sld) Lf 57,140.000 62 662 6034 Wk Zn Pav Mrk Non-Remov (Y)4"(Sld) Lf 48,839.000 63 666 6036 Refl Pav Mrk Ty I (W)8"(Sld)(100mil) Lf 940.000 64 666 6048 Refl Pav Mrk Ty I (W)24"(Sld)(100mil) Lf 124.000 65 666 6054 Refl Pav Mrk Ty I (W)(Arrow)(100mil) Ea 7.000 66 666 6078 Refl Pav Mrk Ty I (W)(Word)(100mil) Ea 4.000 67 666 6141 Refl Pav Mrk Ty I (Y)12"(Sld)(100mil) Lf 518.000 68 666 6170 Refl Pav Mrk Ty Ii (W) 4" (Sld) Lf 15,525.000 69 666 6178 Refl Pav Mrk Ty Ii (W) 8" (Sld) Lf 940.000 70 666 6182 Refl Pav Mrk Ty Ii (W) 24" (Sld) Lf 124.000 71 666 6184 Refl Pav Mrk Ty Ii (W) (Arrow) Ea 7.000 72 666 6192 Refl Pav Mrk Ty Ii (W) (Word) Ea 4.000 73 666 6207 Refl Pav Mrk Ty Ii (Y) 4" (Sld) Lf 119,308.000 74 666 6212 Refl Pav Mrk Ty Ii (Y) 12" (Sld) Lf 518.000 75 666 6303 Re Pm W/Ret Req Ty I (W)4"(Sld)(100mil) Lf 15,525.000 76 666 6315 Re Pm W/Ret Req Ty I (Y)4"(Sld)(100mil) Lf 19,308.000 77 672 6009 Refl Pav Mrkr Ty Ii-A-A Ea 596.000 78 672 6012 Traffic Button Ty I-C Ea 41.000 79 677 6001 Elim Ext Pav Mrk & Mrks (4") Lf 41,000.000 80 685 6005 Reloct Rdsd Flsh Bcn Am (Solar Pwrd) Ea 1.000 81 3076 6001 D-Gr Hma Ty-B Pg64-22 Ton 4,890.000 82 3076 6013 D-Gr Hma Ty-B Pg76-22 (Level-Up) Ton 490.000 83 3076 6048 D-Gr Hma Ty-D Pg76-22 Ton 3,916.000 84 3085 6001 Underseal Course Gal 2,070.000 85 5007 6036 Adjust Of Wtr Vlve Covrs And Vlve Stcks Ea 3.000 86 5007 6039 Adjustment Of Wastewater Manholes Ea 1.000 87 6001 6001 Portable Changeable Message Sign Day 570.000 88 6185 6005 Tma (Mobile Operation) Day 3.000 89 7251 6001 Subsurface Util Locate (Outside Rdbed) Ea 10.000 90 7251 6002 Subsurface Util Locate (Within Rdbed) Ea 10.000 91

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents